mechanical project engineer 3 years experience in construction site in an international petroleum company(SHELL GLOBAL) in egypts westren desert
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 2 years
Relocation: Yes - Internationally
Career Objective
mechanical project engineer (3 years experience in construction) for petroleum international company(BAPETCO)JOINT VENTURE WITH SHELL GLOBAL
Professional Experience
Projects have been participating in it:
1) BED 2/3 Precomprression project:
Installation and erection of:
(10 MW, gas turbine, solar turbines type)
(2 stages driven compressor, siemens type)
(2 gas boots scrubbers)
(2 Air coolers)
(Piping and fittings required for the project)
(Valves and spectacle blinds and by passes required for commission)
(Final coupling alignment of the compressor and the turbine)
(Workshop fabrication and installation of all piping attached to the project)
(Hydrostatic tests, flushing, and air blowing cleaning to all piping attached)
2) BED (15) Water injection project:
Connection of water pipeline to an injector wells
Installation of submersible water pumps
Hydrostatic tests and flushing for pipelines attached .
3) Flow lines:
Construction, fabrication and installation of crude oil, gas and condensate pipeline including:
Pipeline construction projects been participated:
• BED (17-2) 6" gas F/L of length 24 km from the gas (x-mas tree) well hook up to the plant manifold.
• Neag 10" F/L hot -tap tie in with Bed (17/2) 6" F/L.
• BED (2-10) 8" condensate F/L of length 5 km.
• BED (2-1) 6" gas F/L of length 3 km.
• BED (13-4) 6" gas F/L of length 7km.
• BED (4-1) 4" oil F/L of length 2 km.
• BED (18-2) 3" oil F/L of length 3km
• BED (1&19-1) 6" oil F/L of length 650m and 3"gas lift line of 400m
• (JG-7 AND JG-4) 6" water disposal F/L of bed-3 field of 1 km.
• (BED2- south) 6" gas F/L of length 1 km.
• (Sheba 18-3) 3" oil F/L of length 5 km.
• Neag 20" Slug catcher (finger-type) installation, including all piping fabrications and installation attached from Bed-3 plant to NEAG 10" F/L.
4) Miscellaneous repairs activities of the plant:
Emergency repairs and plant shutdowns mechanical activities;
Miscellaneous weldings, exchange corroded pipes and fabrication new pipe spools, boxing pressure vessels and gas boots and reboxing it after the shutdown time, exchange of valves, filters and spectacle blinds.
Shutdowns have been participated:
Bed -3 totals shut down …..(5/7/2005)
Bed -3 partial shut down (train 2)…… (10/11/2006)
Eductation
• University Degree : B.Sc. Engineering
• University : Ain Shams University
• Faculty : Engineering
• Major : Mechanical Power Engineering
• Graduation Project : Cold Storage Design (Grade : Excellent)
• Graduation Year : 2004
• Master Degree : Natural Gas Engineering Diploma ;ongoing(2007-2008)
• University : Cairo University, Faculty of Engineering.
• Major : Mining, Petroleum &Metallurgical Department
• High School Degree : General Certificate
• High School Name : Port said Language School (EL-Zamalek)
• Society of Petroleum Engineers (SPE) membership no. 3298919
Certification
University Degree : B.Sc. mechanical power Engineering Master Degree : Natural Gas Engineering Diploma ;ongoing
Additional Information
Computer Skills
• Windows XP
• MS Word XP
• MS PowerPoint XP
• MS Access XP (2005)
• AutoCAD 2006 ;( Piping isometric drawings, P& I drawings).
• SAP-PS module
Spoken Languages
• Arabic : V. Good
• English : V. Good
• French : Fair
Personal Data
• Name : Emad Aly Abd El Atty Mohammad
• Date of Birth : 18/5/1979
• Place of Birth : Heliopolies, Cairo
• Nationality : Egyptian
• Telephone : Home : (02) 4180986
: Mobile: 0127905791
• Address : 11 Ahmed Shaker St., extended from Ahmed Tayser (koliet el
Banat), Heliopolies, Cairo Egypt.
• Country : Egypt
• Email : madymoody@hotmail.com
• Marital status : Single
• Military status : Exempted
Hot Categories
Chemicals
Batteries