ayman kabil c.v.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 3 years
Relocation: Yes - Domestically
Career Objective
• Since January 2004 till october 2004 working as design engineer at Arab st. fabrication ( ELSEWEDY GROUP).
• Since november 2004 till now as QA/QC Engineer in offshore petroleum projects at PETROLEUM MARINE SERVICES (P.M.S).
Professional Experience
The QA/QC Site manager are concentrated and responsible for all aspects of Quality Control, Quality Assurance, Quality Managements and Welding material.
According to client Specifications and Codes.
And to ensure that such specifications all fully applied and related to the onshore and offshore works in Fabrication, Installation, Laying and Maintenance stages in site onshore and offshore.
The following projects in the Oil, Natural Gas and to numerous Egyptian Companies such as
(GUPCO, PETROBEL, GPC, RASHPTCO, NOSPCO, SOPC ) have been attended
PROJECT: MORGAN-55 & MORGAN- 36 platforms maintenance project.
• Client : gulf ofsuez petroleum company (gupco)
• Time: june 2007 till now.
PROJECT : Dry dock for pms barge 12at suez
• Time : april 2007 till june2007 .
PROJECT : SAQQARA Field development project.
• Client : Gulf of suez petroleum company(gupco)
• Time: dec.2006 till april 2007.
Project : BLAYIM Field development project.
• Client : Belayim petroleum company (PETROBEL)
• Time : Oct.2006 to Nov.2006.
Project : Off shore North Sinai Field development project.
• Client: NOSPCO(North Sinai Petroleum Company)
• Subcontractor for aut. Welding : UMAX with SERMER DASA
• Time: from july to October 2006
Project: pipe line laying.
• Client : suez operation petroleum company (S.O.P.C) .
• Activity : 16" Water Ballast p/l.
• Third party: Loyds Register (L.R)
• Time : june 2006 to july 2006.
Project : pipe line laying.
• Client : Gupco (Gulf of suez petroleum company).
• Activity : Repair of 18" oil pipe line from Ramadan 6 to r/s,also laying of 20"trunk p/l between M36&MWF, also 12" water injection line tie in at M36 phase iv and M-160 p/f also installation of riser and spool pieces at M-160
• Time: Feb 2006 to June 2006.
Project : Qulificatin preparation for gupco projects.
• CLIENT : GUPCo
• Third party : B.V.
• TIME : Jan. 2006 to Feb.2006.
PROJECT: PIPE LINE LAYING .
• Client: Blayem petroleum company (PETROBEL).
• Third party: Rina.
• Time: from Nov. 2005 TO Jan. 2006.
Poject: pipe line laying .
• Client : General petroleum company (GPC).
• Time : OCT 2005 .
Project : Elhamd platform.
• Client :GPC
• Time: July 2005 to October 2005.
Project : pipe line laying .
• Client : Petrobel
• Time : JUNE 2005 to july 2005.
Eductation
Bachelor of Engineering, Electrical Machines and power engineering dept., Faculty of Engineering, Helwan University , cairo in MAY 2002, With grade Good .
General grade : fair .
Bachelor project grade: excellent
Project description: Making a cutting machine using plc system in controlling all its motion.
Certification
• Cswip 3.1(Certification scheme for welding &inspecting personnel) welding inspector from TWI(The welding institute), cert.no.:26978.
• Certification for working at Radiationfield since 2006
• Level Ï Radiographic test for non destructive test on welding (According to ASNT).
• Level Ï Ultrasonic test for non destructive test on welding( According to ASNT).
• Practical use of Matlap prog. Language.
• Bachelor project using plc systems technique with co operate with siemens company.
Hot Categories
Chemicals
Batteries