Egypt Zones accountACCOUNT

petroleum engineer (reservoir)


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 2
Experience: 4 years
Relocation: Yes - Internationally

Industry Experience
4 years Engineer

Career Objective

improve my position

Professional Experience

• Follow up the wells performance on daily, weekly & monthly basis (oil, gas & water) and conduct trouble shooting.
• Open hole logs analysis.
• RFT/MDT interpretations and analysis.
• Defining the main requirements such as pressure measurements, multi rate tests (in gas wells to update the well performance curves and polynomial coefficients to achieve a proper production estimation), production logs, fluid samples, cores ¡Ketc, then analyzing & quality checking to achieve effective reservoir management.
• Calculations of OOIP/OGIP using material balance and volumetric methods.
• Decline Curve Analysis (DCA) to establish proven developed reserves (PDP). Oil behind casing (PDNP) estimation to calculate proven undeveloped reserves (PUD).
• Economic Analysis to new wells based on prediction profile performance.
• Reservoir development plan (reservoir assessment, OOIP/OGIP & reserve calculations and drilling/ST well recommendations).
• Water Injection application.
• Extensive exposure to development of multi-layered shaly sands reservoirs, improving the recovery thru water flood and hydraulic fracturing.
• Quantifiable track record with development wells and increased reserves. I am only a part of Khalda work team, I am not everything.
• Outcome focused.

Eductation

2003 BSc in Petroleum Engineering, Al-Azhar University, Faculty of Engineering. {General Grade, Very Good (79%). Project Grade, Excellent}.

Additional Information

„X I have worked in sand stone and fractured lime stone reservoirs.
„X I dealt with different reservoir mechanisms (depletion drive, water drive& gas cap drive mechanisms).
„X I applied many of hydraulic fracturing jobs to increase the well productivities. Also, I manage many of the injector wells.
„X Some Problems facing with good decision taken for ex, in Shrouk East Field, some well was produce with low oil rate from shallow horizon then, recommended to deepening the well which result in increased oil rate from 50 BOPD to 300 BOPD.
„X I was awarded from the Khalda Chairman for my recommendations of re-entry of the two P&A wells. These two wells have been P&A since 1990's. After re-entry the two wells added ¡Ó1300 BOPD and ¡Ó0.5 MMSTB incremental reserve

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.