Instrumentation Technician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 10 years
Relocation: Yes - Domestically
Career Objective
working at operation maintenence of oil and gas company
Professional Experience
1. Operated and install new instrument device to DCS ( CS 3000 )
Manufacture : Yokogawa
2. Repaired, and operated GOV (Gas Operated Valve), MOV (Motor Operated Valve)
Manufacture: Biffi, Ledeen Dresser, Shafer Valve Co., Limitorque, Rotork, Bettis, Axelson.
3. Repaired, Calibrated, and Installed Pressure Transmitter, Diff. Pressure Transmitter and Temperature Transmitter at Compressor, Oil and Gas Plant.
Manufacture: Rosemount
4. Repaired and Installed Filter Regulator, High pressure Regulator at Oil and Gas well head area.
Manufacture: Fisher Control
5. Repaired, Calibrated and Installed I/P Transducer.
Manufacture: Fisher Control
6. Repaired, Calibrated and Installed Pressure and temperature Indicator.
Manufacture: Ashcroft
7. Repaired, Calibrated and Installed Control Valve.
Manufacture: Fisher Control.
8. Repaired, Calibrated, and Installed Pressure Recorder, Diff. Pressure Recorder and Temperature Recorder.
Manufacture: ITT Barton
9. Repaired, Calibrated and Checked CO2 analyzer.
10. Repaired and Installed relay pneumatic for Instrument shutdown system.
11. Repaired, Calibrated, and Checked Relay pneumatic, pneumatic switch as Instrument shutdown system Ingersol Rand Compressor.
Manufacture: Amot control
12. Maintenance and troubleshooting Reciprocating / Gas engine.
Manufacture : Caterpillar , Waukesha
Maintenance and troubleshooting reciprocating compressor.
Manufacture : Ariel comp, Gemini Comp.
13. Start up and Trouble shooting Compressor
Manufacture: Solar Turbine Caterpillar and Dresser end
14. Installed Smoke Detector and Heat Detector as fire system.
Manufacture: Chub Fire.
15. Troubleshooting and configuration for PLC-5 and SLC-500 ( Allen Bradley
16. Created New Schematic Diagram, New Connection Diagram, P&ID and hook up shutdown system,
Created Risk Assessment & Work Procedure.
17 .Witnessed and Commissioning Some Project in VICO INDONESIA
Eductation
Diploma II Polytechnic
Tech. High School
Junior High School
Elementary School : 2 years, 1996 (Samarinda East Kalimantan )
: 3 years, 1994 (Samarinda East Kalimantan )
: 3 years, 1991 (Samarinda East Kalimantan)
: 6 years, 1988 (Blitar East Java)
Certification
1 2001, completed Safety Training Observation Program “STOP” license by Dupont
2 2001, completed First Aid Training by Medical Department of Vico Indonesia
3 2003, completed Work Permit System WPS. 6 by Vico Indonesia
4 2005, completed Fire Fighting Training and Breathing Apparatus by Vico Indonesia
5 2007, completed General Engine Operation & Maintenance ( GEOM ) by Trakindo at TC Cileungsi Bogor.
Additional Information
Instrument Calibrator
Familiar for using instrument calibrator such as:
1. Model 275 HART® Communicator
2. Digital Diagnostic Tool ( 7X1400 Caterpillar )
3. Promac Calibrator
4. MILLIAMP Calibrator, ALTEK
5. Pneumatic Calibrator, WALLACE & TIERNAN
6. Process Multimeter PMM 330A
7. Dead Weight Tester , BUDENBERG
8. FLUKE 52, Type K/J Thermometer
9. FLUKE Model 741B/743B Documenting Process Calibrator
Hot Categories
Chemicals
Batteries