Completion
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
Finf a bob within a leading Oil and Gas Industry Sector Company
Professional Experience
Baker Oil Tools (2001 to present)
Product Line Engineer for Cased Hole Completion Department (2006 – Present)
Responsible for selecting, ordering and preparing of the completion equipment for various Customers, supervision of correct assembling of the equipment in the workshop. Prepared detailed work instructions to follow up the North Sea Quality requirements, and well schematics to support Customer’s requirement. Prepared and participated in the presentation of Baker Oil Tools equipment to “Turkmenneft” in Turkmenistan. Prepared quotes on the equipment. Worked closely with Customers to support their operations. Well familiar with high pressure wells and H2S environment. Very familiar with SAP.
Technical Specialist Tools (2001 to 2006)
Ran Tools:
o Permanent Packers, Mechanical and Retrievable Packers, Dual Packers
o Flow control equipment
o Sub-surface and surface safety systems
o Remedial and Stimulation Tools (acidizing, fracturing and cementing with downhole tools, service packers for Hurricane Application)
o Deep set safety valves
o Installation of surface safety systems with control panels
Performed completion jobs with various Baker Oil Tools Equipment, cementing jobs, zonal acidizing jobs in the USA
Work in Kazakhstan
o TengziChevroil (Chevron in Kazakhstan), HP/HT Completion with 13% H2S
o Texaco
o KKM (LukOil Kazakhstan)
o KKMOC
o Maersk Oil Kazakhstan
o JV Arman (Oryx Engergy)
o Uzenmunaigaz
o Mangistaumunaigaz
o JV Tenge
o KPO Agip - Completion with Premier Packers, first multilateral completion job with a torque master packer, HPHT with 9 %H2S
o Zhaikmunai
o Big Sky
o Kensary
o KOA
o Turkmenistan (“Dragon Oil”, “Turkmenneft”)
Work in Russia
o TNK-BP (South Urengoi Field, HPHT Condensate Field)
o Camoco-Philips to run Cased Hole Completion Equipment (Water Injection Wells)
Run and Very familiar with:
o Permanent, Mechanical, Retrievable Packers, Dual Completion
o Liner hanger equipment
o Well control problems when running completion equipment under balance
o Snubbing Unit in Tirkmenistan for “Dragon Oil” (Off Shore Completion, HPHT)
o H2S environment and safety regulations
Eductation
Technical College 1987 (Construction)
Certification
o Basic Remedial and Stimulation Equipment
o Intermediate Packer Systems from the Houston’s Training Center
o Flow Control Systems
o Sub-Surface Safety Systems
o Surface Systems from the Aberdeen’s Training Center
o Liner Hanger Systems in Dubai in 2006
o Completed Advanced Tubemove Seminar (stresses on tubing and downhole equipment due to a pressure and temperature change) in Houston in 2007.
o Finished and obtained a certificate of the off-shore survival course from Aberdeen in 2005.
o Had an 8 month training program both in the workshop and out in the field, USA, South Texas (Corpus Christi).
Hot Categories
Chemicals
Batteries