10 YEARS EXPERIENCE IN GAS PROCESSING FOR PRODUCTION OF AMMONIA
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
To work in an exciting and professional environment of an organization with continuous learning development and growth possibilities.
Professional Experience
As FIELD OPERATOR OMIFCO (OMAN); Nov¡¦04 to Apr¡¦07
„u Distinguished efforts towards handling pre -commissioning and commissioning activities such as making punch list for construction / maintenance purpose, Air Blowing (pipe lines and vessels including Reactor vessels ) , Steam Blowing etc.
„u Executed pre commissioning and commissioning of Rotatory machinery like TURBO COMPRESSORS (Steam and Air blowing of pipe lines, OST of steam turbines.
„u Handled surge testing and operation of Air compressor, synthesis compressor,, ammonia refrigeration compressor ) attach with MICRONET CONTROL SYSTEM.
„u Supervised sections of NH3 plant wiz; compressors area (field as well as control room ), NG let down station, NG desulphurisation, Reforming section (induced draft furnace ), C02 removal section, NH3 synthesis, NH3 Refrigeration, and Hydrogen Recovery Unit.
„u Functioned as a panel operator for three days out of six days in a week in OMIFCO Ammonia plant, equipped with YOKOGAVA CENTUM CS 3000 R3, and YOKOGAWA ESD system for safe operation and safe shut down of plant.
„u Single handled monitored various equipment.
„u Handled isolation of individual section, rotatory and stationary equipments / Vessels depressurisation, purging, cooling, blinding (wherever required) and safety tagged.
As Operator Trainee & Operator: Sep¡¦95 to Nov¡¦04
„u Successfully executed the pre -commissioning and commissioning of Aonla Expansion NH3 Plant based on TOPSOE TECHNOLOGY with NAPHTHA + N.G. Feed.
„u Actively involved in handling the following at NH3 plant:
o Catalyst loading of NH3 Converter, LTS ,Reformer ,Pre -Reformer, Shift Reactor, Methanator, ZNO absorber ( desulphuriser).
o Chemical cleaning of Boiler Feed Water as well as Steam drum.
o Refractory Dry out jobs of Primary Reformer and Secondary Reformer refractory.
o Steam Blowing and Air Blowing of gas pipe lines and vessels.
„u Single handedly handled various responsibilities at every section of i\I IJ plant such as:
o NG + Naphtha desulphurisation, Pre-Reforming , Reforming section ( balanced draft side fired reformer).
o Boiler Feed Water quality control ( PH, Conductivity, etc.) C02 removal section (Absorption and Stripping), Synthesis of NH3 section.
o Gas Turbine driven Air compressor attach with Heat Recovery Unit,
Eductation
B.Sc.( Chemistry,Physics,Mathematics)Three years degree course from KUMAON UNIVERSITY ,NAINITAL (UTTERAKHAND) INDIA
Certification
PROFESSIONAL ENHANCEMENT INITIATIVES
„u DRY GAS SEALS operational and maintenance course at OMIFCO SUR site, conducted by GE Energy Oil and Gas.
„u CENTUM CS 3000R3 FUNDAMENTALS at OMIFCO SUR site conducted by YOKOGAVA.
„u Fire and Safety training programme at IFFCO , and at OMIFCO site.
Additional Information
PERSONAL VITAE
Date of Birth : 8th August 1973
Nationality : Indian
Passport Status : Ready & Available
Marital Status : Married
No of Dependents : 2
Languages : English & Hindi
Permanent Address : Avantika puram, Gauzazali Bichali P. O. Industrial Estate, Bareilly Road, Haldwani, NAINITAL, UTTARAKHAND, INDIA
Hot Categories
Chemicals
Batteries