POSITION.-PIPELINE ENGINEER INTERMEDIATE.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 24 years
Relocation: Yes - Internationally
Career Objective
Responsible of All Results in Projects including Coordinate all Civil, Mechanicals, Electro mechanical construction site activities, management teams, delivering the engineering required on projects .
Professional Experience
Project assistant (1977-1978)
Construction of Gas Pipeline of 48 diam – H. Cardenas, Tabasco – Mexico
Project Engineer (1978-1980)
Project : Gas pipeline of 48" of Diam. x 160.0 Km. Cactus Chis-Sn Fdo. Tam
Construction of a Gas Pipeline of 45 km x 36" of Diam. Venta of Carpio- Sta. Ana, Hgo :
Construction of a Gas Pipeline of 36" of Diam. San juan del Rio Gro. And 40 Km.
Superintendent of Construction and Admon of Projects (1980-1982)
Construction of a Policonductor of 20" x 40.0 km. In Tecamachalco, Pue.
Construction of a Policonductor of 20" of Diam x 125.0 km. Cordoba
Construction of a Gas pipeline of 12"of Diam x 38.0 Km.
Construction of a Gas pipeline of 8" of Diam. x 25 Km. In Apizaco,Tlax
Superintendent of Construction Republic of Colombia (1983-1986)
Responsible of the Direction of the. Construction of a gas pipeline of 18" of Diam. x 145.0 Km. Cd. Of Cartagena y Covnas , Tolu Dept. Construction of a Gas pipeline of 20" of Diam. and 120Km. t. of Riohacha in the Guajira . This construction was to ECOPETROL and PROMIGAS.
Superintendent of Construction in Mexico (1986-1988)
Construction of an aqueduct 48" of Diam.x 40 km Coatzacoalcos, Ver. including Dragados Enamel Interior Special Instalations of Valves
Construction of a Gas pipeline of 36" x 15 Km. Huimanguillo, Tab
General Superintendent of Construction of the South Zone in Mexico (1988-1992)
Construction of a Gas pipeline of 12" x 50 Km. located totally in a pool of Stagnant zone Pemex, City, Tab.
Construction of a Gas pipeline of 48" in the pool of Stagnant zone including supplies of materials with the valve of $50 Millions US
Construction of the Highway of Monterrey Laredo, Section Cuesta of Mamulique. 85 km of highway.
Manager of National Projects (1988-1992)
Manager of The Plant of Lastrados and Exterior Recovering , Anticorrosive covers Permaducto, Co. S.A. de C.V
Cost consultant (1995-1998)
Responsible of the Direction, examination and Presentation of Some National and International Contests, examination of bases, direction and Supervision in the Development of the Contest in different areas of construction.
Responsible of the elaboration od the Enron-Techin- Protexa.
Construction of a Gasconductor between Cd. Pemex and Merida.
Contest with $65 Million U.S between several gas pipelines in the Southeast of Mexico.
Eductation
TRAINING :
School : Nuevo Leon, University of, Civil Engineering .UANL. Monterrey Mexico
Degree / certificate : Instituto de Ingenieria Civil ,UANL .Monterrey, Mexico
Profetional Cedule No.- 480097
Additional Information
Advisor in the Contest for Companies (2002-2004)
Ingenieria y Topografia Avanzada de Mty, and AVVA construcciones S.A de C.V.
Tasks :
Administration projects
Analysis of unit Prices and Costs
Control of Costs and Estimations, Planning and Control.
Preparations and Estimations, Contests and Offers.
Elaboration of a basic Program as a Contests Base and Estimations.
Quality Control in Labor and Projects. Administration in National and International Labors. Application of anticorrosive Exterior Tubes (Valves) linked to the Petroleum and Water Industry
Hot Categories
Chemicals
Batteries