Manager-Projects -Instrumentation
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
To work in challenging environment for utilizing the knowledge,experience and skills. Interested to work as consultant/advisor for engineering,selection, procurement and commissioning activity of sophisticated instrument systems for process plants.
Professional Experience
I am a qualified Instrumentation Engineering Professional with 36 years of field experience in heavy chemical manufacturing process industry. My core strengths lye in the area of Project Management and Maintenance Management of Process Industries having Batch & Continuous Processes.. Lastly I was functioning as Deptt. Head - Instrumentation at Navin Fluorine International Limited Surat-India- an Arvind Mafatlal group company. This is India’s first and largest fluro-chemicals manufacturing complex.
Eductation
[1] Diploma in Mechanical Engineering
[2) Post Diploma in Instrumentation and Control engineering
[3] Appeared for AMIE examination in Electronics and Communication Branch,
cleared section-A and 4 papers in section-B.
I could not clear remaining 4 papers because of increased responsibilities at work
Certification
Technical
1 Training on HAZOP conducted by Reputed consultants of Mumbai
2 "TPM” conducted by in-house expert Mr. Thapliyal
3 “Microprocessor in process controls” conducted ISA –India in 1979
4 Internal Auditors Training Program on ISO 9001:2000 conducted at Mumbai
Additional Information
Recently I have done the total Instrumentation engineering of GEPCO –Dubai. It is a hydrocarbon refining plant and commissioned successfully.
I am highly interested in doing the project engineering (instrumentation & Cotrol) of new grassroot level very large project and involving latest class of instrumentation.
I have worked with all the latest field in control panel instruments of all world renowned manufactureres. I have vast experience of maintenace of highly hazardous and continuous process plants. I have also carried out total instrumentation project work of about 14 plants in my career. The last project i did was as per requirement of Akerkvaerner-uk and ineos floor-uk.
Hot Categories
Chemicals
Batteries