Egypt Zones accountACCOUNT

instrunentatin engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 11 years
Relocation: Yes - Domestically

Industry Experience
11 years Engineer

Career Objective

instrunentatin engineer

Professional Experience

Damanhour 325MW Power Plant as Instrumentation & control Engineer:

1-Good experience in DCS control system symphony harmony based on function codes .

2- Good experience in many control systems such as BMS*, PLC*, TSI*, RSE*,EHC

3- Calibrate, test and maintain for different field instrumentation such as vibration sensors, differential expansion, absolute expansion, thrust bearing wear detector, temperature sensors, flow transmitters, level transmitters, pressure transmitters, level controller, temperature controller, pressure controller, pneumatic valves (control & On/Off) and motorized valves and hydraulic valves (control) in the following systems: -
(I) Boiler.
(II) Turbine and auxiliaries.
(III) Demineralization plant and waste water treatment plant.

4- Good experience in fire fighting and fire alarm systems.

5- Supervision on ABB company in Damanhour power plant project for boiler Modification (Natural gas, Heavy fuel oil and Diesel oil) in installing, erection , commissioning and start up and handled the Following tasks: -
a-BMS system
b-Boiler protection
c-Closed loop control
d-MFT cabinet
e-SOE recorder

6- Supervision on M&S company in Damanhour power plant project for boiler modification (Natural gas, Heavy fuel oil and Diesel oil) in installing, erection ,commissioning and start up and handled the Following tasks: -
a- Installing new cable trays for the new cables of 16 burners.
b-Pulling cables from the control room (BMS) to the field (burners).
c-Installing the following field instruments: Pressure switches , pressure
transmitters , Flow transmitters , Differential pressure transmitters , Heavy
fuel oil counter , Control valves and Feed back
d-Loop testing and commissioning for the burner management system

7-Supervisin on Horiba company in damanhour power plant project for Continuous Emission Monitoring System in installing, erection ,commissioning and start up and handled the Following tasks: -
a-Installing Analyzer cabinet
b-Connecting the analyzer Measurements with the existing DCS

Eductation


Graduated from : Alexandria University

Degree : BS.C Electrical Engineering.
Graduation Date : May, 1993
Graduation Avg. : GOOD (72.18%)
ALXENDRIA

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.