Stokes & Speihler / March 2007 – August 2009
Marathon Oil Chief Inspector for MMS Level 1 Structural Inspection on Ewing Banks G12136, Platform 873 A.
Rozel Operating Co. Chief Inspector for instullation of 4-pile Control Platform, Installed a total of 395’ per line of 2-3” & 1-6” pipelines
Along with risers, all ICP piping top side, Installation of
Safety Systems on New and Existing Platform. Made job Scope for entire job at the beginning and half way through.Along with organizing divers on lift boat, service personnel, Construction crews, equipment, materials, daily cost, field
Boats and docks.
Rozel Operating Co. Chief Inspector for 10” pipeline tie in with installation of 10” smart flange. Along with organizing divers on lift boat, service personnel,Construction crews, equipment, materials, daily cost, field
Boats and docks.
Northern Natural Gas Chief Inspector for platform abandonment & removal of communication tower on Matagorda Island 686 C. Along with organizing service personnel construction crews, equipment, materials, daily cost, field boats and docks.
Northern Natural Gas Inspector during saturation dives to abandon 1,000 feet of 24” pipeline and install new 24” jumper line with two
misalignment ball flanges.
Welding Inspector
• Fabrication of new 24” pipeline jumper with installation of two misalignment ball flanges & hydro testing.
Rozel Operating Co. Chief Inspector on installation of well protector deck, 48” caisson with top deck & production equipment, riser hook ups & ¼ mile of 2”, 3”, 4” & 6” pipelines on West Cameron 2.
Cherokee Consultants / October 2005 – March 2007
Apache Chief Inspector for installation of temporary flare boom for H & P 100 Drilling Rig.
Welding Inspector
• Fabrication of new flow lines from manifold to wellhead and
installation of new well bay deck on Ship Shoal 354.
Apache Chief Inspector for riser hook up & platform installation on West Cameron 33. Along with organizing lift boat, service personnel, construction crews, equipment, materials, daily cost, field boats and docks.
Welding Inspector
• Fabrication and installation of process piping and vessels
Eductation
Abbeville High School
Louisiana Technical College
Certification
Safe Gulf, Water Survival & Defensive Driving Course,Twic Card
Hot Categories
Chemicals
Batteries