offshore field engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
Working as Field Engineer on board of the heavy lifting vessel ¡§PJ 12" I was responsible for following up all steps of pile driving operations, piles final cut-off, hook up, risers, and spools connections and pipe laying operations.
Professional Experience
• 16¡¨Saqqara P/L and platform installation
Client: BP
Work Description : pipe laying for 12 km pipeline and jacket and deck installation activities
• 22¡¨ pipe line and platform installation
Client: North Sinani Petroleum Company
Work Description: automatic welding for laying for 60 km tieing between the shore and platform installation activities for the jacket and deck.
• 16¡¨ P/l and platform installation
• Client: Petrobel
• Work Description: pipe laying for approx 2 km semman jacket and deck installation
• 12¡¨ pipeline between M36/M160
Client: GUPCO
• Work Description: laying the 12 " tieing between M36/M160 and installing of mattress / sleepers on pipeline route.
• 8¡¨ pipe line
Client: SOPCO
• Work Description: laying the 8 " tieing between shore and elhamad platform
• 24¡¨ p/l
Client: PETROBEL
Work Description: laying the piggy back 24 " tieing between Nouras ¡Va to Barboni platfrorm
Client: PETROBEL
Work Description: laying the piggy back 18"/4 " piggy back tieing between Baltim East and Baltim- N
• 26" P/L from Nouras ¡Va to Barboni pigging and hydro testing
Client : PETROBEL
Work Description: pigging and hydro testing for the 26" p/l
• 26" closing spool
Work Description: fabrication and installation 26" closing spool piece at Barboni P/F and installation of the closing spool at Nouras -A.
• Temsah Nouras Nw jacket and deck
Client : PETROBEL
Work Description: Installation of Nouras NW new portion jacket and deck.
• Barge PMS -12 at dry dock.
• PF-A new monopode: installation with relevant top site facilities and the assembling bridge between PF and PF-A platforms
• 18¡¨ P/L tie in at M36-M8
Client : GUPCO
Work Description : Demolish old spools and fabricating new spools on M36 platform and installing new values.
• 26¡¨ P/L
Client : PETROBEL
Work Description: pipe line laying tieing between Nouras/A and barboni platform 16.9 Km
• 24¡¨ P/L
Client : PETROBEL
Date : September 04,october 04
Work Description: pipe line laying tieing between Temsah-4 P/F to Temsah-nw P/F 5.4 Km.
Client: BURULUS GAS COMPANY CONTRACTOR:TECHNIP OFFSHORE
Work Description: installing new 4¡¨simian and 4 ¡§ sapphire and 10¡¨ new pipe line as piggybag and installing simain jacket and deck
Eductation
• BSC Mechanical engineering Alexandria University (power section) May 2003 , Graduate project: Air flow around building with final grade very good.
• El Nasr Boys School (EBS) - Alexandria. English School Education
Certification
„Ï Risk assessment Faculty of Engineering Alexandria university
„Ï Piping design &fabrication ENPPI
Hot Categories