Six years of experience in laying, testing & commissioning of underground carbon steel pipelines for industrial gas distribution projects as a construction engineer. I have also experience in RT & UT Quality work in cross country pipeline.
Professional Experience
PEC Pumps:
• Worked as a Assistance Quality Inspector in P.E.C. Pump(ISO 9001) for one year.
Jai Hind Project Ltd.
• Worked as a site engineer in gutthalam to PPN Project.(Pipe Grade:18”Dia X 35 K.M.Api 5LX65).
• Worked as a site engineer in Vizag to Secundrabad.(VSPL Project).(Pipe Grade:12”Dia X 84 K.M. Api 5LX60)
Jai Somnath Iron Works:
• Worked as a site engineer in Agra to Firozabad Gas Pipe Line Project.(Pipe Grade:10”Dia X 33 K.M. Api 5LX 60)
• Worked as a site engineer in Gurgaon Chainsa Natural Gas Pipe Line Project.(Grade:16”Dia X 60 K.M.Api 5L X65).
Corrtech International Pvt.Ltd.
• Worked as a site engineer in South Gujarat Gas Pipe Line Project.(Pipe Grade:16” Dia X 29 K.M. Api 5L X 65).
• Worked as a site engineer in IPCL to GIPCL spur line Project.
• Worked as a QA/QC assistance in Kalol-Santej Gas Pipe Line Project.(Pipe Grade:16”X 14 K.M. Api 5L Gr.B)
• Worked as a QA/QC Incharge in GFL Spur Line Project.(Pipe Grade: 8”X 7.5 K.M. Api 5L X 60).
Gujarat State Petronet Ltd.
• At present working as a site construction engineer with GSPL.(India’s second largest gas transmission company.)
• Anklav-Dhuavaran Pipe Line Project.(Pipe Grade: 16”X 32 K.M. Api 5LX 65).
• Kalol-Himmat Nagar Pipe Line Project.(Pipe Grade: 12”X 60 K.M. Api 5LX65).
1. To witness Hydro Testing and Pneumatic test of Pipeline.
2. Monitoring all Pipe line Project activities.
3. Reviewed RT films & witness UT of pipeline joint.
4. Qualifying Piping & Structural welding Procedures & welders as per applicable Codes
5. & Project Specification.
6. Monitoring all Project Documentation work.
JP Kenny Triune Ltd.
Worked as a site engineer in city gas distribution project at valsad(Gujarat)
Monitoring all activities,and approved procedure and controlling all documentation.
Mac Crown Enter Prise.
Worked as a Site Eng in New Depot Project Kafco (KUWAIT).
Worked there as a Main line Incharge and look after other activities like stringing,grading
And coating.I also worked there in microtunneling which is used in major road crossing and river crossing and culvarts.
Eductation
ACADEMIC QUALIFICATION
STANDARD BOARD/UNIVERSITY PERCENTAGE PASSING YEAR
S.S.C. GSEB,Gandhinagar 75.14% March 1996
Diploma in Mechanical. Gujarat Education Technical Board. 60.61% June 2000
Autocade 2000 Kruti Computer,ahemedabad. 80.16% Oct 2000
I have also passed RT & UT Level II from Bhide testing Institute (Mumbai).
Additional Information
ACADEMIC QUALIFICATION
STANDARD BOARD/UNIVERSITY PERCENTAGE PASSING YEAR
S.S.C. GSEB,Gandhinagar 75.14% March 1996
Diploma in Mechanical. Gujarat Education Technical Board. 60.61% June 2000
Autocade 2000 Kruti Computer,ahemedabad. 80.16% Oct 2000
I have also passed RT & UT Level II from Bhide testing Institute (Mumbai).