Production engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 5 years
Relocation: No
Career Objective
position where my skills and practical experience can add value to a company, and where I can grow professionally and personally
Professional Experience
More then five years of experience as a Production engineer.
Proficient in Production optimization from sand face to the plant; well production, injection, and surface network modeling, and optimization.
Proficient in gas lift implementation and optimization.
Proficient in well production test design and analysis.
Proficient in pressure transient design and analysis.
Performing oil production, gas and water injection allocations back to the wells
Write programs for flushing and commissioning of lines.
Strong computer skills; experienced with the leading production engineering and Simulation software.
Senior Production Engineer July 2005 to Date
Groupement Berkine (Sonatrach-Anadarko Corporation) currently base in Hassi Messaoud, Algeria
Management of five fields’ production of an average of 250 Kbbls/d.
Build Surface Network system using the GAP software which incorporates all the Five-Field wells (120 including shut in wells).
Perform well performance surveillance by regularly testing the wells with MPFM, Vx and Separator, and using Prosper for production test analysis. Based on these analyses, a remedial solution is selected such as Tubing salt wash and Asphaltine clean out.
By using Saphire, perform pressure test analysis. Based on the results, a stimulation job is recommended to enhance the production of that well.
Provide training and mentoring for younger production engineers and technicians.
Production Engineer March 2002 - July 2005
Groupement Berkine (Sonatrach-Anadarko Corporation) currently base in Hassi Messaoud, Algeria
By using Prosper, Performed well performance analysis of oil producers and gas lift wells. The number of the oil producers is about 50 from five different fields commingled to the same plant.
By using Saphire, Performed static pressure analysis of water and gas injectors. The total number of the wells between water and gas injectors is 54 acting as field pressure maintenance wells.
Performing oil production, gas and water injection allocations back to the wells. This is conducted by using Prosper and Excel files on one hand, and by using FieldView and FieldBA on the other hand.
Monitoring well production by regularly testing the wells with MPFM, Vx and Separator.
Eductation
Master of Science in Petroleum Engineering Dec 2001
Mewbourne School of Petroleum & Geological Engineering, University of Oklahoma
Bachelor of Science in Petroleum Engineering June 1998
National Institute of Hydrocarbon and Chemistry (currently University of Boumerdes), Boumerdes, Algeria
Certification
• PVT course ENSPM, IFP FRANCE Nov 2006
• IWCF certificate Drilling division of Sonatrach April 2005
• Well test analysis course Edinburgh Petroleum Services Sept 2004
• Well test analysis ( Saphire) in house training, Groupement Berkine July 2003
• Dynamic Surveillance System in house training, Groupement Berkine July 2003
• GAP course in house training, Groupement Berkine June 2003
• Prosper course in house training, Groupement Berkine June 2003
• FieldView and FieldBA course in house training, Groupement Berkine July 2002
Additional Information
SPE 77949:”Determination of Fracture Orientation by Multi-Well Interference Testing”
Hot Categories
Chemicals
Batteries