senior instrument technician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 10 years
Relocation: Yes - Domestically
Industry Experience |
10 years |
|
Technician |
0 years |
|
|
0 years |
|
|
Career Objective
instrument technician
Professional Experience
POSITION HELD MAIN DUTIES * EMPLOYER
Senior Instrument Technician
Instrument Technician
Instrument Technician Involve in troubleshooting of process field instrumentation & automation faults, Logic interlocks (Intermediate & ESD system), Corrective & Preventive Maintenance of instruments at all Refinery units / areas.
Troubleshooting / calibrations and maintenance of Rotary equipment instrumentation installed at Multistage Compressors (Reciprocating & Centrifugal) and High pressure Pumps.
Overhauling & calibration of control valves, pneumatic & electronic transmitter, Level Troll, Switches and pneumatic controller / recorder.
Worked on different units for troubleshooting of instruments faults / problem to process dept. , Overhauling & calibration of control valves, transmitter ( Flow,Pressure,Level,Temp.) , Level Troll, Switches etc. etc. Pak-Arab Refinery (Parco) Karachi Pakistan.
National Refinery Ltd. (NRL) Karachi Pakistan.
Fauji Jordan Fertilizer Karachi Pakistan.
Eductation
1- Diploma of Associate Engineer In Electronics Technology
(03 Years) 1998.
2- Secondary School Certificate.
3- Higher secondary school(pre-engineering with Math,physics,chem
Certification
Diploma In Petroleum Refining Technology
( Instrument) Pak-Arab Refinery
(PARCO)
02 Years
Tank gauging system
Pak-Arab Refinery (PARCO)
Sakura Endress
One week
TLAS
(Truck Loading Automation System)
Pak-Arab Refinery (PARCO)
Fisher Rosemount
9 DAYS
Different types of HSE trainings:-
1-work permit system
2-Emergency
Procedures etc Pak-Arab Refinery (PARCO)
After every one month
Additional Information
Planning & scheduling of job to be done. Organizing the spare, Coordination with other dept. for jobs. Job supervision by
Communicating adequately, doing analysis & conclusions of instrumental / operational faults & problems.
Use of Computerized Maintenance Management / inventory control System (MAXIMO).
Supervised two shut-down at PARCO refinery in 2002, 2007 & my scope of work covered, Control valves, Compressor, Steam Turbine & high pressure Pumps instrumentation removal, overhauling, calibration check, reinstallation and start-up sport.
Calibration & configurations of the VELOMETER & SISMEIC, PROXIMITY PROBES, checking their characteristics by TK3 (wobolator) of BENTLY NEVADA Vibration Monitoring System for heavy duty Pumps, Compressors Steam Turbines.
Calibrations & maintenance of the control valves, positioners & digital control valves of make Mason élan, Fisher & Brooks.