Egypt Zones accountACCOUNT

Final Project: Depropanizer Parameters optimization.


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 2 years
Relocation: Yes - Internationally

Industry Experience
0 years Engineer
1 years Other
0 years Engineer

Career Objective

engineer process

Professional Experience

February 2009 till today: Process Engineer « oil and Gas Processing » In STAH Region – ALRAR GAS Field - ALGERIA

Expertise in Oil & Gas operations and treatments (Condensate and LPG recovery, including molecular sieve gas & liquid dehydration, propane refrigeration and deethanizer, debutanizer, depropanizer columns distillation.
A good understanding of turbo-expanders, combustion gas turbines and Gas compression.
Dry gas reinjection and storage
Storage of condensate and LPG
July 2008 : One month practical training in sonatrach Hassi messaoud field - ALGERIA
February to july 2005 : Practical Training for Engineering project in SONATRACH Hassi-R’mel field
Final Project: Depropanizer Parameters optimization.
September 2004 : Practical Training of one month in the Production Division SONATRACH Hassi-R’mel field- ALGERIA

Eductation

2000 : Baccalaureate in Chemistry ; grade : good.
2000-2005 : Refining engineer degree graduate from BOUMERDES University ALGERIA
2008 : Specialised Engineer exploitation at Algerian Petroleum Institute (IAP-ALGERIA)
2008 : HYSYS Training Algerian Petroleum Institute-BOUMERDES (IAP-ALGERIA)

Certification

2008 : Specialised Engineer exploitation at Algerian Petroleum Institute (IAP-ALGERIA)
Process simulation, development and optimization using HYSYS software.

Additional Information

Process simulation, development and optimization using HYSYS software.
Process design of gas dehydration and sweetening units.
Ethane and hydrocarbon dew point recovery using propane refrigeration system.
Sizing and rating two phase, three phase horizontal and vertical separators.
Optimization and sizing of process plant piping, pumps, compressors and heat exchangers.
Simulation of separation, stabilization, amine treating and gas dew pointing/turbo expander and sour water stripper units in HYSYS, Heat and Mass balance generation.
Monitor outside process equipments.
Equipments start up and equipments and process monitoring.
Start up: facilities, utilities and equipments (pumps, compressor, heaters, turo-expander, LPG splitters, deethanizer and inlet facilities).
Shut down, isolate and for maintenance.


HYSYS, ASPEN – steady state simulation tool
Microsoft office, Internet

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News » Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.