Project Manager - 12yrs. experience in city gas distribution and cross country gas pipeline
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 12 years
Relocation: Yes - Internationally
Career Objective
To lead the project team for execution of any world class gas transmission and distribution project.
Professional Experience
Work Experience
December ’01 – August ’02 : Adani Energy Limited
& March 2003 – Jan. 2008
Position : Working as Sr. Manager (Projects)
Project Description :
• City Gas Distribution Project for Baroda & Ahmedabad cities within
Gujarat state of India. 185 kms steel and 5000 km high density /
medium density (HDPE /MDPE) polyethylene network of various sizes.
I was called as core team member and contributed as follows in City
Gas Distribution
→ Conceptualization of Ahmedabad and Vadodara Network – steel grids
(L-185Kms)
→ Group leader for construction of 70kms (12”, 8”, 6” and 4”
diameter), 05 nos. CNG stations and 01 City Gate Station for
Ahmedabad city
• Now, I have been assigned the same job profile for three new cities –
Faridabad (L- 50Kms) within Haryana state, Noida (L – 35Kms) & Lucknow
L-30Kms) within Uttar Pradesh state of India.
August ’02 - March 03 : Tractebel Engineers & Constructors Private Limited.
Position : Project Co-ordinator (Asst. Manager)
Project Description :
• Paguthan-Baroda & Baroda-Ahmedabad-Kalol Natural Gas Pipeline project,
18”& 24” API 5L X65, L - 210Km
Dec. 1995 – Dec. 2001 : Gujarat Gas Company Limited
Position : Asst. Manager
Projects :
• FEED Study for 130kms gas transmission network within
Gujarat state for British Gas
• Hazira-Ankleshwar Transmission Line (74 km, 18” diameter).
• Surat-Vareli Transmission Pipeline (22 km, 18”&12” diameters).
• Amboli-Jhagadia Transmission Pipeline (23 km, 10” diameter).
• Ankleshwar-Panoli Transmission Pipeline (32 km, 8”&6” diameters).
• Surat City Distribution Network (600 km of PE distribution network).
A Brief description about present assignment
The present assignment involves an end to end activity profile encompassing the planning, development and operationalization of the conceived project. It also includes expediting Statutory clearances / RoU acquisition, Land Acquisition, Environment studies (REIA, DMP, RA), finalization of Contractors / agencies for various activities & material management / co-ordination with consultant, contractors, client & vendors in the context of execution of Project.
Eductation
Academics
• B.Sc. (Engg.) in Civil, First Class from N I T / R E C, Jamshedpur, India,
1990-94
Additional Information
SKILL PROFILE
o FEED Study, Detail Engineering and Construction
- City gas distribution pipeline
- Cross-country gas transmission pipeline
- Civil Works: City Gas Station, Compression facility, Control
room, Sectionalised Valve station, Gas Metering Facility,
Custody transfer facility & Filtration skid
o Conceptual design and facility layouts for civil facilities /
structures associated with gas transmission & distribution projects
o Pipeline Construction and associated facilities. Project Management &
Construction.
o Route Survey, Geotechnical Investigation & Hydrographic survey
o Right of Users (RoU / RoW) Acquisition and Statutory Clearances
o Planning, Budget, QA/QC Plan, Work Contract, Vendor Finalisation and
Execution of Civil Construction Works.
o Documentation and drawing
STRENGHTS
o Well conversant with all relevant international / national codes, Acts
& Regulatory requirement relevant to pipeline projects.
o Project Management & Analytical background for pipeline projects
o Ability to perform independently right from FEED Study to Asset
turnover stage for any pipeline project.
o Excellent presentation and written communication skills.
Hot Categories
Chemicals
Batteries