Civil/structural designer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Domestically
Career Objective
disciplined and self motivated young lady, I possess good interpersonal/communication skills, high level of understanding and I am ready to learn and contribute to incorporate the goals of any organization I am involved with.
Professional Experience
DELTA AFRIK ENGINEERING LTD. NIGERIA 2005 till date)
1.Pigging facilities up grade project (NOV 05-JUN 06)
Location: Inim IP production Platform Escravos.
Client: Mobil producing Nigeria limited.
DUTIES:
Civil/structural design drawings
Structural framing drawings, Phase II;
Site visits,
Main deck and cellar deck framing plan,
Modification drawings, detail drawings, demolition drawings,
SACS Analysis and weight control reports
Installation drawings,
Material Takeoff and BOM.
Piping supports layouts drawings
Process design drawings,
Phase II;
Revised P & ID Drawings
Line list,
Revised equipment list.
II. Chevron crude oil wash tank project (OCTOBER 05-MARCH 06);
Location: Escravos terminal
Client: Chevron Nigeria LTD
DUTIES:
Detail design of wash tank plant house,
Structural design and analysis of pipe supports
Material takeoff and weight control reports,
Safety and job progression meetings.
Pipe support layout drawings
SOFTWARE USED: Auto-cad
Microsoft excel
III. CHEVRON OKGS (OLOKOLA GAS PROJECT) July06 Dec. 06
Client: Chevron Nigeria LTD
DUTIES:
Generating and propagating model files using plant design (fwp) system 2d/3d.
Copying and referencing design models from design area to modification area
Attaching and detaching designs models.
Freezing views
Detail design of living quarters Ancillary deck using micro-station
Structural design of jacket, boat landing, bridge, bridge walkway,
Flare tower, flare jacket, Handrails and gratings of the Funiwa Gpp living quarters platform. Using PDS (fwp). 2d/3d.
Generating material reports from the PDS design area.
Updating material reports on Microsoft excel.
Project meetings and reports
SOFTWARE USED: Plant design systems
Micro-station
Microsoft excel
IV. CHEVRON OKGS (OLERO CREEK PRODUCTION PLATFORM PROJECT) JAN SEPT. 06
Client: Chevron Nigeria LTD
DUTIES:
Detail design of north flow station and north water station
Material reports.
Modification of platforms design.
Site visit.
SOFTWARE USED: Plant design systems
Auto-cad 05
Microsoft excel
Eductation
(H.N.D) Building /Structural Technology,
Auchi polytechnic, Auchi. (2003)
(N.D) Building /Structural Technology
Auchi polytechnic, Auchi. (2000)
Certification
PROFESSIONAL MEMBERSHIP: (graduate member) National institute of Builders
Additional Information
TRAINING experience:
Auto - cad 2d/3d 2005
Micro-station v7.1 2006
Sacs pro. 2005
Material takeoff 2005
Beam analysis 2005
Plant design systems (frame work plus) version 7.3/ 2005
Staad pro. 2005
First aid at work (Red cross society) 2006
Basic fire fighting course(Federal fire service) 2006
Microsoft suite workshop 2007
All of the above were organized by DELTAAFRIK Engineering ltd.
CODES AND STANDARDS:
Conversant with and have applied the following engineering codes and standards
API, BS, USS, SID, AISC, ASTM.
OTHER SKILLS/ACHIEVEMENTS:
Estimating and price analysis,
Detailing and specification.
Material take off
Incident /injury free awareness workshop
(CNL crude oil wash tank project.)
Nov. 2005.
General windows applications, proficiency in Microsoft word, Microsoft Excel, Microsoft Access, Microsoft project, coral draw, and PowerPoint.
Hot Categories
Chemicals
Batteries