3.3 Years oil and gas refineries experienced B.E Mechanical Engineer with ASNT Level 11
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
3.3 Years oil and gas refineries experienced B.E Mechanical Engineer with ASNT Level 11 (RT, PT, UT&MPT), Project Planning software PRIMAVERA 3.0,and exposure in Projects,Fabrication,Production,Maintenance and shutdown seeks challenging assignments
Professional Experience
From Feb 2007 to Dec 2007 -DHAFIR TECHNOLOGIES LLC ABU DHABI - UAE (ELECTRO MECHANICAL CONTRACTING COMPANY)
PROJECT & QA/QC ENGINEER
„X PROJECT-Bottom Loading System Installation For ADNOC Various Distribution Terminal In UAE (AL AIN,RUWAIS ,BEDA ZAYED & RAK)
„X CLIENT- ADNOC FOD
„X CONSULTANT-PENSPEN INTERNATIONAL
„X PROJECT- 30¡¦¡¦Fuel Oil & 12¡¦¡¦Fuel Gas Pipe Line In ALZAWARA POWER PLANT AJMAN-UAE
„X CLIENT- FEWA (FEDERAL ELCTRICITY AND WATER AUTHORITY)
„X CONSULTANT-FEWA
„X PROJECT ¡VInstallation Of Vapour Recovery Systems For Loading Racks at JABEL ALI AND SHARJAH TERMINALS
„X CLIENT ¡VEMMARAT
„X CONSULTANT-MOTT MACDONALD INTERNATIONAL
From Dec 2004 to Dec 2006 ¡V kochin refineries contract works.
TPS Builders Limited & Prayaga Engineering Constructors, Ambalamugal, Kochi
Project Engineer
„X TPS Builders Ltd, One among the leading thermal power stations and oil refineries works contractors in India. Prayaga engineering contractors one among the leading contractors in kochin refineries ltd Amblamugal is doing erection and fabrication works of pipelines, tanks, pressure vessels, stacks, Ducts and equipments like pumps, compressors etc. They are also specialized in fire fighting systems and Boiler Maintenance. They execute similar works in Hindustan Organic Chemicals Ltd.
Responsibilities.
„X Supervising above said works in kochin refineries ltd
„X Planning, Scheduling and Controlling of Projects.
„X Assisting in cost estimation of projects.
„X Preparing Drawings and Billing.
„X Quality analysis.
„X Inspection materials, fit -up, visual inspection
Major Works Executed.
„X FCCU shut down job.
„X Piping and connected works for routing stabilized Naphtha from CEP bypassing tank 104 at KRL. (Projects)
„X 8¡¨ Five Kilometer long Duct iron piping to KINFRA.
„X Piping works and erection of API Oil mechanism at KRL. (Projects)
„X Piping for replacement of Firewater / Foam lines in Tank 18 at KRL. (Projects)
„X Modification, Transportation, Erection of Steel Stack and connected misc. works at CPP of KRL. (Shutdown ¡V Planning)
„X Increasing the height of CO Boiler Stack at KRL. (Shutdown ¡V Planning)
„X Fabrication, Erection of new Stack with Foundations for UB-3 Boiler at KRL (Shutdown ¡V Planning)
„X „X
Eductation
BE-MECHANICAL ENGINEER
Hot Categories
Chemicals
Batteries