Electrical Installation,Inspection,Testing,Commissioning and Hook Up
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
Being on a Electrical Engineer with team leader and solving all kind of technical issues and safety issues,and supporting & Co ordintion with other deparments
Professional Experience
TECHNICAL EXPERIENCE
•Harweel Oil&Gas (EOR Project) - 132 & 33Kv Over Head Line ( Single and Twin ELM),132/33Kv GIS Substation,132/33KV,33/11KV,33/415v,63MVA,17MVA,15&2MVA Transformer, Plant Earthing, Cathodic Protection for Tank and Pipe Line, Providing Temporary Cathodic Protection for Pipe Line,33KV Main Booster Station Substation, Control Station,11KV Substation
•Offshore Oil Field Project – Power Transformer, MV Transformer, Earthing Transformer, Bus Duct,33MW Generator, Water and Gas injection Compressor, Sea Lift Water Package ,Core filter package, Instrument Air Compressor, Glycol regeneration System, Manifold,33KV and LV Control room ,11KV Capacity drive Water cooling medium, Heat Tracing system, Public address system, Telecommunication system ,Fire and Gas system,Lighting,Earthing
•Northern Oman Gas Project – 33/415V Transformer, LV Control Room, Glycol Regeneration, Compressor's, Plant Lighting, Plant Earthing, Fin Fan Coolers, Cathodic Protection in Pipe Line, Block Valve Station, Gas metering Station, Testing, Commiss and Hook Up with Existing plant
•Al Shuweihat S1 Power and Water Project – 3 x 100M³/h capacity Demineralization plant
•Dubai Electricity and water Authority Power Plant Project – Gas and Steam Turbine, Auxiliary and Waste Heat Recovery Boilers, Bus Duct, Power Transformer, HV and LV Cable Laying and Glanding&Termination,Turbine control room, UPS ,
•Mawelah 132/33KV GIS Ring Main Substation Project - Installation, Testing and commiss of switchgears, protection relays, 125 MVA, 132 / 33 KV transformer, 132 KV, 33 KV GIS, outdoor 33 KV switchyard, LV switchboard, , control panels, relay panels, 132 KV grid substation
•Oman LNG Project - Gas Turbine Generator 32MW X 4nos, 63MVA Transformer x 4 Cable Laying, Glanding and Termination of Power and Control Cable Heat Tracing system, Telecom, Public address system, Fire and Gas System, Installation Of Earthing Electrodes, Plant Earthing, Equipment Earthing. Measuring Of Earth Resistance of Electrodes, Installation of UPS system, Installation of Cable Trays
•Thermal Power Plant Project – Installation ,Testing & Commissioning of 6.6KV Control room,415V Switch Board, HT & LT Motors in Coal Handling Plant, HT & LT Cable Laying, Glanding,Transformer,6.6/415V Transformer ,Electrical Hoist, Coal Handling Plant all related Equipment Like Crusher, All kind of Conveyors’ drive,
Eductation
TECHNICAL TRAINING
1. Installation and Maintenance of Electrical and Instrument Equipment in Potentially Hazardous Area Course
2.Internal QMS Auditor ISO 9001-2000 from LRQA Cert No: 5063NHQ0700112/05
SAFETY TRAINING
1. Basic first aid course from Gulf technical & Safety Engineering Centre LLC
2. STOP for Supervision from DUPONT
3. Job Hazardous Analysis (JHA) from OTI Oman
4.3 Days Basic Life Support Programme from OTI Oman
5. H2S Entry Permit Course from Safety Technical Services Co LLC.
6. Performing authority Certificate from BP-AIOC
SOFTWARE TRAINING
1.MS Office
2.Win Pcs
1994 3 Years Diploma in Electrical & Electronics
Engineering, Tamilnadu,India
2005 Installation and Maintenance of Electrical and Instrument Equipment in Potentially Hazardous Area