BE Mechanical/Piping Engineer with 3 years experience
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
Designing,isometrics,hydrotest diagrams,pump calculations,trim drawings,calculations,Material take off,pipe size calculations,valve datasheets
Professional Experience
Sep 2006 Till Today
Company : Saudi Arabian KENTZ Co. Ltd
Designation: Piping Engineer
Project : Port & Berth Facilities for Acetic Acid, Acetic Anhydride & VAM for SIPCHEM & Royal Commission for Jubail & Yanbu
Job Description:
„«Preparation & checking of Isometrics, Hydro Test Diagrams & Material Take Off.
„«Wall Thickness, Hydro test pressure & Hot Tap calculations.
„«Checking of Piping Plan as per P&ID¡¦s.
„«Inter Departmental Communication.
„«Preparation of Trim Drawings.
„«Preparation of valve data sheets.
„«Preparation of Hydraulic Diagram.
„«Force main sizing & Pump Calculations.
„«Gravity Flow Pipe size Calculation.
June 2005 To Sep 2006
Company : Philips Electrical Industries of Pakistan
Designation: Trainee Engineer
Project : Installation of Flood Lighting at Faisalabad & Multan Cricket
Stadia for Pakistan Cricket Board
Job Description:
„«Execution & Installation of Flood Lighting at Sea View for DHA.
„«Execution of Mechanical, Civil & Electrical work of flood lighting project for Faisalabad & Multan Cricket Stadia.
„«Communication with the Client & Contractors during fabrication & erection.
„«Working with the team for installation of Ballast Factory.
„«Quality inspection of incoming and outgoing material.
January 2005 To June 2005
Company : Western International Pvt.Ltd
Designation : Reliability Engineer
Job Description:
„«Borescopy inspection of Turbine at BHP Billiton.
„«Vibration Analysis of pumps at Pak Arab Fertilizer in Multan.
„«Borescopy inspection of Turbine at OGDCL, Qadir Pur.
„«Boiler Tube inspection in ICI Polyester at Sheikhu Pura.
„«Vibration Analysis in Dhabejee pumping station.
„«Coordination with the Maintenance staff during Plant Shutdown in Pakistan PTA
Eductation
ACADEMIC EDUCATION
B.E Mechanical from N.E.D.U.E.T.
2000-2005 B.E. A Grade
1997-1999 H.Sc. A Grade
1995-1997 S.Sc. A Grade
Hot Categories
Chemicals
Batteries