Well Testing Supervisor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
Perform Field production tests, build up, drawdowns, clean up, bottom hole logins.
Professional Experience
Well Testing Field Supervisor Burgos VI Project
Schlumberger Completions Reynosa, Mexico
Dry Gas High Pressure Wells.
Performing Well Testing for dry gas wells, cleaning up the well with coil tubing equipment, stimulating the well with coil tubing equipment and nitrogen, Testing at atmosphere with several burners, Expertise in setting up multiple sets of Well Testing equipment and supervising the overall operation all this for PEMEX production wells. Supervising the certification and re-certification for the overall sets in base Reynosa.
While in this position the following wells were successfully delivered for production:
Assistance to Well Site Supervisor Burgos V Project
Schlumber Completions Reynosa, Mexico
Dry Gas High Pressure Wells
Assisting the Well Site Supervising in well running Wireline logins such CBL/VDL, Gamma Ray, Conveyed Perforations, Drawdown Tests, Build up Tests, Injectivity Tests, Assisting under supervision for Hydraulic Sand Fractures, Cleaning Up the well with Coiled Tubing, Inducting the well with Coil Tubing and Nitrogen injection, Well Testing, Surface Read Out, Potential Tests. All this was realized for production wells for PEMEX client.
While in this position the following wells were successfully delivered for production:
Well Testing Field Supervisor Burgos IV Project
Schlumberger Completions, Reynosa Mexico
Performing Well Testing for dry gas wells, cleaning up the well with coil tubing equipment, stimulating the well with coil tubing equipment and nitrogen. Traveled to offshore base in order to perform Well Testing for oil and gas wells in jack up’s and EPF mounted on Schlumberger boat project CORA. Acquisition system installed in order to have real time data.
Well Testing Field Supervisor Burgos III Project
Schlumberger Completions, Reynosa Mexico
Performing Well Testing for dry gas wells, cleaning up the well with coil tubing equipment, stimulating the well with coil tubing equipment and nitrogen. Traveled to offshore base in order to perform Well Testing for oil and gas wells in jack up’s and EPF mounted on Schlumberger boat project CORA. Acquisition system installed in order to have real time data. Several slickline jobs performed, well calibration, memory pressure and temperature gradients and surface read outs.
Eductation
Electronic Engineer
(Microprocessors, Power Systems, Instrumentation) UAT Cd. Reynosa, Mexico 2001-2003
Not finished
Electronic Technician
(Microprocessors, Power Systems, Instrumentation) C.B.T.i.s. #7 Cd. Reynosa, Mexico 1996-1999
Completed Degree
Certification
Overseas Survival 02/2001
Cd. Del Carmen, Mexico
SWT-12 Well Testing
Surface Well Testing and Reservoir Introduction 03/2001
Pau, France
Explosives Handling 12/2004
Reynosa, Mexico
Preventive Well Control 02/2005
Reynosa, Mexico
Well Control 03/2005
Reynosa, Mexico
Loos Prevention Team Leader 10/2006
Reynosa, Mexico
Hot Categories
Chemicals
Batteries