qaqc certified welding inspector.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
i have 8 years experience in inspection of various projects of cross country pipelines ,lng,lpg storage tanks.
Professional Experience
i am a ndt asnt level2 in rt ut mpi pt . i am certfied cswip 3.1 welding inspector. 3 years experience in india and 5 years experience in gulf countries.
Eductation
i am graduate in mathmatics.
and intermediate in science in physics ,chemistry, math.
preseatraining in various construction of shipbuilding.
Certification
cswip 3.1 welding inspection.
asnt ndt level 2 in rt,ut,mpi,pt.
radiation safety in industrial safety.
work permit receiver in various projects.
Additional Information
• EXPERIENCE/RESPONSBILITY: Eight Years experience as,NDT TECHNICIAN,NDT CO-ORDINATOR, QA/QC INSPECTOR,CERTIFIED WELDING INSPECTOR In Various projects of cross country pipe lines,Petroleum refinery projects, LPG Tanks ,LNG Tanks Projects In INDIA AND ABROAD
• :Having good knowledge in cross country pipe lineWelding,,LPG and LNG (9%nickel low tempretureAlloys ) Tanks welding. i.e SMAW,SAW,GMAW,TIG .
• :Carried out UT Lamination check,Thickness Gauging ,Monitoring weld scanning, with the CRATCRAMERflaw detector,EX-10,EX-100,GALLELEO MACHINES. Carried out MPI BY AC and DC YOKE.
• Methods.Carried out LPT. Interpretation of RT FilmWith client specification and.suitable codes.
• Carried out visual inspection of weld,fit up.and all
• Before ,during ,after welding inspection.
• :I have served and enthuastic role and monitor all
• Welding and Inspection activity as per API 1104,B31.3
• ASME Sec –VIII Div –I,ASME Sec-IX.
• Monitoring of hydrotest and prepararation of hydrotest package.
• Correct execution of repairs from RT FILMS and UT test.
• Preparation of PWHT procedure from project specifaication and codes.monitoring of PWHT and review of PWHT charts.
• Preparation of welders rejection report.
• Preparation punch list in pipings before hydrotest .
• Interpretation of RT films with API 1104,B31.3 codes.
• Co-ordination with NDT subcontractor. For the specific out put of project.
Hot Categories
Chemicals
Batteries