RESERVOIR ENGINEER
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
Summary
I have three years experience as a Reservoir Engineer ; junior Reservoir Engineer
• Reservoir Engineer for General Petroleum Company (GPC) from 6/2005 till now .
•
Professional Experience
General Petroleum Company (GPC)
Reservoir Engineer
JUNE 2005 ¡V TILL NOW
„X Responsible for reservoir engineering monitoring of Ras Gharib field (oldest field in Egypt, since 1938, 277 wells).
„X Performing reservoir management plans for future well proposal of Ras Gharib field.
„X Building several Single Well Models (SWM), and over all Reservoir Simulation Project using ECLIPSE Simulator for Ras Gharib Field.
„X Member of Ras Gharib group study.
„X Responsible for creating OFM projects for all the oil & gas fields of GPC (500 Wells).
„X Computing OOIP using the volumetric method, the material balance equation and compare with the results from OFM.
Eductation
under Graduation:
College : Faculty of petroleum mining Engineering, suez canal University.
Department : Petroleum Engineering
Certificate : B.Sc. Petroleum Engineering
Graduation year : 2004.
General Grade : good
Project Grade :Very good
Certification
under Graduation:
College : Faculty of petroleum mining Engineering, suez canal University.
Department : Petroleum Engineering
Certificate : B.Sc. Petroleum Engineering
Graduation year : 2004.
General Grade : good
Project Grade :Very good
Additional Information
Computer Experience
„X Operating Systems: MS-DOS, and MS-Windows XP.
„X Programming Languages: FORTRAN.
„X Excellent user for general application software (MS-Office XP, Acrobat, etc.).
„X Good user for oil industry related software (ECLIPSE Simulator, Oil Field Manager (OFM), Automate (well test analysis program) Landmark
„X Good user of the networks, workstation capabilities and the Internet.
1. Performing different scenarios in the prediction phase include the possibility of water injection into lower reservoirs, infill wells, watered out and optimizing the current gas injection project.
„X Responsible for Monitoring of gas injection performance Project (EOR), to Maximizing the Recovery through (Monitoring injection rate, gas front advanced, and Gi/Gp ratio).
„X Performing pressure transient test analysis for GPC wells, using well test analysis, automate software (LANDMARK).
„X Well logging interpretation (old generation such as (SP, electrical log since 1938), and modern generation logs such as {CMR (Schlumberger)}, {MRL,SED, EHRI, CAST-V for cement and casing evaluations (Halliburton)}.
„X Production logging interpretation (PLT) and Thermal Decay Time Tools (TDT).
„X Analyze RFT/RDT data to determine : the fluid gradient , contacts, reservoirs communication.
„X Responsible for annual reserve reviews and annul production forecast.
„X Dealing with fractured limestone, and sandstone Reservoirs.
Hot Categories
Chemicals
Batteries