C HEMICAL ENGINEER
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 15 years
Relocation: Yes - Internationally
Career Objective
1.WATER SUPPLY, TREATMENT, SEWAGE TREATMENT AND WASTE
MANAGERMENT.
Professional Experience
..E. INDUSTRIAL TRAINING AND JOB EXPERIENCE
POSITION
COMPANY/EXPERIENCE
DURATION
SIWES STUDENT
DELTA STEEL COMPANY (DSC) ALADJA WARRI, DELTA STATE
WATER SUPPLY, WATER TREATMENT, SEWAGE TREATMENT
3 MONTHS 10TH OCT., 1991 -9TH JAN 1992
SIWES STUDENT
IMPROCHEM CHEMICAL PRODUCERS WARRI, DELTA STATE.
PRODUCTION AND PACKAGING OF INDUSTRIAL CHEMICALS. BENTONITES, DRILLING SALTS, E.G CMC LV CAUSTIC SODA, HV KCL, D.DBARYTERS AND BAROTROL.
. 6 MONTHS 15TH JUNE, 1992 -14TH DEC., 1992
LECTURER
(N.Y.S.C) METALLURGICAL ENGINEERING DEPARTMENT, THE POLYTECHNIC. BIRNIN KEBBI STATE
1 YEAR (12 MONTHS) 14TH NOV., 1995 - 13TH NOV., 1996
PROJECT ENGINEER
EXPRESS INTERNATIONAL PLANT HIRE (NIG.) LTD 77A AIRPORT ROAD, WARRI.
(A) PROJECT: WASTE PIT REHABILATAION BY SOIL STABILISATION, EVWRENI (WELL 10) SPDC) CONTRACT NO. W.1850 (PILOT SCHEME) (B) WASTE PIT MANAGEMENT, CASTING OF KERBS WITH WASTE MUD (WITH MIX RATIO) (C) ENVIRONMENTAL IMPACT ASSESSMENT (E.I.A)
1 YEAR 12 MONTHS) JAN. 28TH, 1997 - DEC. 1998.
SITE ENGINEER
EXPRESS INTERNATIONAL PLANT HIRE ( NIG.) LTD., 77A AIRPORT ROAD, WARRI.
PROJECT: EDJEBA GAS INTAKE MANIFOLD MODIFICATION WORKS. CONTRACT NO. W. 04010 (SPDC PROJECT). FABRICATION OF GAS PLANT SPOOLS, INSTALLATION OF BALL VALVES E.T.C. IN GAS PLANTS PRESSURE TESTING OF PIPES (30 BARS - 150 BARS), SUPERVISION OF RADIOGRAPHY OF PIPES, CORROSION CONTROL (CATHOLIC PROTECTION MONITORING) AND MATERIALS
PROCURMENT
APRIL 2ND, 1997 - MAY 15TH, 1997
SITE ENGINEER
EXPRESS INTERNATIONAL PLANT HIRE (NIG.) LTD., 77A AIRPORT ROAD, WARRI.
PROJECT: SITE INSTALLATION WORKS. RE. OGBOTOBO CONTRACT NO. W. 004167 (SPDC PROJECT). WORKSHOP FABRICATION OF FLOWLINES, PILOT LINES AND FLARELINES SPOOLS. CORROSION CONTROL
8TH DEC., 1999 - 11TH MAR., 2000.
SAFETY OFFICER GOLDEN FOUNDATION NIGERIA SERVICES 29, IGBI STREET WARRI.
ENVIRONMENTAL IMPACT ASSESSMENT.
APRIL 2000 - DATE
Eductation
. QUALIFICATIONS OBTAINED WITH SCHOOL AND DATE
1. SCHOOL LEAVING CERTIFICATE
A.) MOWOE PRIMARY SCHOOL WARRI (1976 - 1982)
2. WEST AFRICAN EXAMINATION COUNCIL
(W.A.E.C.) HUSSEY COLLEGE, WARRI (1982 - 1987)
3. BACHELOR OF ENGINEERING IN CHEMICAL
ENGINEERING (B. ENG. CHEM)
UNIVERSITY OF PORT-HARCOURT CHOBA. PORT - HARCOURT (1988 - 1995)
4.DIPLOMA IN COMPUTER OPERATIONS AND PROGRAMMING
COMPLETE COMPUTER SYSTEM IN COLLABORATION
WITH THE POLYTECHNIC BIRINI-KEBBI.
5. CERTIFICATE IN SAFETY AND SECURITY MANAGEMENT. 2005
C. PROJECT WORKS AND SUPERVISIONS
1) PROJECT WORKS:
i.) DESIGN PROJECT:
DESIGN
Certification
3. BACHELOR OF ENGINEERING IN CHEMICAL
ENGINEERING (B. ENG. CHEM)
UNIVERSITY OF PORT-HARCOURT CHOBA. PORT - HARCOURT (1988 - 1995)
4.DIPLOMA IN COMPUTER OPERATIONS AND PROGRAMMING
COMPLETE COMPUTER SYSTEM IN COLLABORATION
WITH THE POLYTECHNIC BIRINI-KEBBI.
5. CERTIFICATE IN SAFETY AND SECURITY MANAGEMENT. 2005
Additional Information
7.PRODUCTION OF CEMENT.
. E. INDUSTRIAL TRAINING AND JOB EXPERIENCE
POSITION
PROJECT ENGINEER
EXPRESS INTERNATIONAL PLANT HIRE (NIG.) LTD 77A AIRPORT ROAD, WARRI.
(A) PROJECT: WASTE PIT REHABILATAION BY SOIL STABILISATION, EVWRENI (WELL 10) SPDC) CONTRACT NO. W.1850 (PILOT SCHEME) (B) WASTE PIT MANAGEMENT, CASTING OF KERBS WITH WASTE MUD (WITH MIX RATIO) (C) ENVIRONMENTAL IMPACT ASSESSMENT (E.I.A)
1 YEAR 12 MONTHS) JAN. 28TH, 1997 - DEC. 1998.
SITE ENGINEER
EXPRESS INTERNATIONAL PLANT HIRE ( NIG.) LTD., 77A AIRPORT ROAD, WARRI.
PROJECT: EDJEBA GAS INTAKE MANIFOLD MODIFICATION WORKS. CONTRACT NO. W. 04010 (SPDC PROJECT). FABRICATION OF GAS PLANT SPOOLS, INSTALLATION OF BALL VALVES E.T.C. IN GAS PLANTS PRESSURE TESTING OF PIPES (30 BARS - 150 BARS), SUPERVISION OF RADIOGRAPHY OF PIPES, CORROSION CONTROL (CATHOLIC PROTECTION MONITORING) AND MATERIALS
PROCURMENT
APRIL 2ND, 1997 - MAY 15TH, 1997
SITE ENGINEER
EXPRESS INTERNATIONAL PLANT HIRE (NIG.) LTD., 77A AIRPORT ROAD, WARRI.
PROJECT: SITE INSTALLATION WORKS. RE. OGBOTOBO CONTRACT NO. W. 004167 (SPDC PROJECT). WORKSHOP FABRICATION OF FLOWLINES, PILOT LINES AND FLARELINES SPOOLS. CORROSION CONTROL
8TH DEC., 1999 - 11TH MAR., 2000.
SAFETY OFFICER GOLDEN FOUNDATION NIGERIA SERVICES 29, IGBI STREET WARRI.
ENVIRONMENTAL IMPACT ASSESSMENT.
:
Hot Categories
Chemicals
Batteries