driller/ night pusher
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Industry Experience |
4 years |
|
Driller |
Career Objective
workover rigs and well services
Professional Experience
working with M/S B.S CHAUDHARY AND COMPANY IN A ONGC PROJECT AS A DRILLER. IT’S A ONGC PROJECT IN MEHSENA. Wells I have handled till now are SRP, FISHING EOR wells etc. Job performed Fishing with different tools provided by ONGC, milling and cement drill.RIG I M HANDLING NOW IS UPET ROMANIA it’s a 50 ton rig.ASST DRILLER 4th JUNE 2004 to 25th 2006 DECEMBER SHIV-VANI OIL AND GAS EXPLORATION SERVICES UNDER OIL INDIA PROJECT DULIAJAN, ASSAM. RIG NAT110 UE using conventional drilling technologyWorked with CENTURY RESOURCES AS AN ASST DRILLER BLOCK BELONGS TO PREMIER OIL IN CACHAR DIVISION RIG IS NAT 1320 IT’S A TOP DRIVE RIG.Also had worked with North Eastern drilling and work over services it’s a MMC company in work over rig (mechanical, 500 HP) in naharkatia, Assam under oil India ltd for a short term period. As a shift in-charge Rig which I m handling now is UPET Romanian 50 ton. It’s a n electronics rig.The rig which I have handled is E1400 (1500 HP) . This is a electrical rig in which rig is connected to a power grid usually produced by its own generators· My job profile1. Rig mobilization.2. Mast up/down. 3. Providing proper tools during the operations and preparing tally.4. Installation and function test of BOP. · Selection of drilling spool.· Operating function and pressure testing of all bop rams · Working on Kelly cock (upper /lower) after each round trip.5. Maintaince of kick control unit and all accessories involved.6. Establishing a proper communication between mud engineer and drilling crew to control all mud parameters.7. Proper maintaince of mud gas separator, vacuum degasser, kill manifold, choke manifold are done.8. Conducting bop drills and other safety drills.. 9. Record graph sheet to be fitted and adjustment to be done as soon the gang is changed. The following parameters are recorded.· Weight on · Pump SPM· Rotatory Torque· Pump Pressure· Rate of penetration 10. Weekly inspection of the safety equipments .11. Worked on reciprocating pumps and centrifugal pumps.12. Maintaince of caterpillar engine D398b model that is twelve cylinder V-engine. GENERAL MAINTAINCE· Engine oil level check· Air cleaner element to be cleaned· Coolant level to be checked· Front and Rear clutch shift collar · Main shaft bearing oil reservoir i.e. maintain oil level between the ADD and FULL marks on the dipstick. Rig we
Eductation
bachalor in mechanical engineering
Additional Information
Was maintaince engineer of top overhauling of caterpillar engines d398b. JOB PERFORMED· Liner changed · Replacement of all bearings and rings and other accessories.Specification · KVA 1000· POWER 800KW· RPM 1200 rpm· PHASE 3F· Hz 60· GEN VOLTAGE 600V· CURRENT 1203 V· ROTATION (FACING EXCITER END) COUNTER CLOCK WISE· ARM 80° C RISE BY RES· FIELD 80° C RISE BY RES
Hot Categories
Chemicals
Batteries