completion engr
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
Petroleum Engineer concerning the subsurface operation or production technology and to be effective in position proper with my technical & interpersonal skills
Professional Experience
Supervise the hydraulic fracture operations & analysis.
Supervise the DST, PLT & TDT jobs (rigless or rig operations) & carries out preliminary log interpretation and evaluation of test results.
Supervise the important completion, R/C and W/O jobs.
Undertakes rigless completion and testing of newly drilled/worked over wells.
Maintains comprehensive database on wewater production/injection and gas injection statistics.
Follow-up the performance of the artificial lift wells, producing utilizing both ESP, & sucker rod systems.
Follow-up the performance of the natural oil producers & water injectors and issue the corrective programs W/ the necessary actions.
DST programs preparation and executing supervising.
Hydraulic Fracturing programs (rig & rigless)..
Testing & Initial completion programs for oil, gas wells & WIW.
-Cased hole logging (PLT, TDT, CBL,
.etc.).
Initial ESP Installation design & programs.
Initial Sucker Rod Pump design & program.
Remedial Work, Re-Completion, Re-entry programs included:
-Water shut off jobs for high W.C. wells
-Add perforations
-Replace ESP & sucker rod completions.
Formation stimulation via Acid jobs.
Correlation for perforation by TCP or CSG guns, bridge plug setting, Completion PKRs
Evaluation of new zones by testing them naturally or by lifting using coiled tubing & N2.
On-Shore work-over rigs supervision.
Prepare the required programs and supervise the operations for rigless- jobs:
-Through TBG perforation.
-Well cleaning, lifting & fishing using coiled TBG.
-Well unloading using coiled TBG & N2.
-Production tests. (Gas & Oil wells).
-ESP back washes (acid, water or diesel).
-Multi-rate tests.
-Wire line jobs (set & unset plugs, valves, memory gauges through TBG
.etc).
-R/C in from zone to another using wire line.
-Pressure surveys (Static, flowing, build-up & fall-off).
-Formation treatment (acid stimulation or diesel) for producing (oil & gas) & injectors wells.
Follow-up the production and injection performance:
-Follow up the producing wells (oil & gas) & injection wells performance.
-Follow-up the performance of the natural oil producers & water injectors and issue the corrective programs with the necessary actions.
Eductation
1-CSM (Colorado School of Mines) Colorado, USA
This academic degree, long educational and training course, which is sponsored by Khalda and Apache (Egypt).
This course included lectures and projects and was held in Egypt
2. B.Sc in Petroleum Engineering. (May-2006).
Issued from: Faculty of petroleum and mining Engineering, petroleum engineering dept. Suez Canal University
Graduation Grade: good
Graduation Project grade: Excellent.
Studied the major topics of oil and gas industry as reservoir engineering, production engineering, drilling engineering, petroleum geology, petroleum economics, petrophysics, geophysics and refinery. The final project had been conducted in onshore oilfield in Belayiem Petroleum Company, south gharieb formation (Sinai field).
Hot Categories
Chemicals
Batteries