Career Objective
To get job in an organization that offers utilization of my skills and where I can develop my carrier and learning opportunities to keep pace with advanced technologies
Professional Experience
Currently Working as a Electrical & Instrumentation Engineer in DESCON Engineering Qatar LLC, on RAS Laffan Olefin Project, Qatar. My responsibilities are to make the plan for execution look ahead one month and more it. The material Indents for site execution supplied by either sub-contractor or client & doing its Inspection. The technical queries as Report for inspection and dealing with engineering departments. The IFC drawing modification and the Standards modification.
RESPONSIBILITIES
ELECTRICAL
1:- Installation of Cable Trays
Aboveground Electrical cable routing according to IFC drawings
Secondary cable tray routing design and installations
2:- Lighting system
Designing the cable tray route and installation of cable trays for lighting
Cable laying for lighting and monitoring in field
Installation of Lights, Lighting JB and panels
3:- Cathodic Protection Works (CORROPO Products)
Installation of Equipment Bond Box (EBB)
Installation of Isolation joint (IJTF)
Installation of DPTP (Drain Post)
Installation of RXTP (Road Crossing)
Installation of T/R (Transformer Rectifier)
Installation of HVAC (Protection from High Tension Lines)
4:-Earthing-Underground earthing, earth pits installation and mesh network installation.Aboveground earthing to the cable trays, equipments and all the electrical motors, generators, junction boxes, panels, etc.Earthing to the lighting cable trays, panels and Junction Boxes.Earthing to the Instruments, Instruments Junction Boxes
4:- Power (HT/LT) and Control Cable Lay.
5:-Work at Sub-Station
Erection of HV/LV Switchgears and MCC Panels at sub-station
Erection of 6.6 kV Transformers.
6:- Instructing the supervisors to carry out all the activities as per IFC drawings and construction standards.
7:-Issuing request for RIT for the finished work.
8:- Working closely with senior engineers and following their instructions.
INSTRUMENTATION
1:- Installation of Cable Trays
Aboveground Instruments cable routing according to IFC drawings
Erection of cable trays for Instrumentation through P&ID IFC
Cable tray installation in Central Control Room
2:-Cable Laying
Instrument Main Cable Laying according to cable schedule
Secondary cable laying JB to JB
BSS Engineer (Dreaming Link, HUAWEI U-Fone Project) (OCT 2006-Feb 2007)
BSS Engineer (SIEMENS Mobile Engineering Pakistan) (May 2005-Jun 2006)
Eductation
2001– 2004 B. Sc. Electrical Engineering
University of Engineering & Technology Taxila.
Hot Categories
Chemicals
Batteries