application for project engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
to enhance my capability in technical skill in oil & gas industry
Professional Experience
June 1999 ˇV December 2004
Project Engineer, Petrochemical plant, MTBE (M) Sdn Bhd (a PETRONAS Subsidiary Company). Responsibilities:- Undertake Plant Modification / improvement projects. Nature of works involved includes engineering, procurement, construction, and commissioning. Below are details of my work scopes / responsibilities:-
4.1) Engineering Design Phase
„« To identify end user requirement and transform into project objectives.
„« Establish project feasibility study report including project payback period calculation, to evaluate whether or not it is worth to invest in the project or not, or to come up with new alternative(s).
„« Prepare project cost estimates up to 30% accuracy.
„« Identify project critical paths activities, and reflect those in project schedule
„« Prepare project Gantt chart schedule, using Microsoft project software.
„« Maintain a database of all prices of equipment, materials, utilities rate, manpower rate and transportation rate, for the purpose of future project budgetary cost estimates.
„« Prepare the Engineering Design package for each project.
„« Establish contractorˇ¦s scope of work and supply for each project.
„« Establish piping tie-in check list
„« Identify and tag tie-ins at site
„« Work closely with Piping Designer in developing Piping Isometrics drawings
„« Review / check project piping isometrics drawings and M.T.O. (Material Take-Off)
„« Review / check project As-Built Document i.e. Piping Plan drawing, isometrics drawing, Equipment and mechanical datasheet.
„« Perform engineering design calculation, i.e. pressure vessel thickness, MAWP, Pump sizing, PSV sizing, based on applicable Engineering code and Standard and responsible for developing Purchase Equipment Datasheet.
„« Liaise directly with Process Design licensors i.e. UOP (Texas, USA), Kvaerner (UK), Mitsubishi Heavy Industries (MHI, Japan) in resolving technical issues / queries in term of mechanical equipment design data conflicts and in equipment failure analysis.
„« Maintain Technical correspondences filing between, licensor, Contractor and owner.
„« Write project Invitation To Bid document, (I.T.B.) for EPCC, EPC, EPCM contracts.
„« Prepare weekly and monthly project progress report.
„« Develop project S-Curve Graph
Eductation
Educational Background
June 1995 ˇV December 1998 Colorado State University, Fort Collins Colorado, USA. Bachelor Of Science in Mechanical Engineering
June 1993 ˇV May 1995 MARA Community College, Batu 8, 25100, Kuantan Pahang. American Associate Degree
January 1993 ˇV May 1993 College Negeri, Negeri Sembilan. Intensive English Program
January 1991 ˇV December 1992 Upper Secondary School, Sek Men Sultan Haji Ahmad Shah (SEMSAS), Kuantan Pahang. Sijil Pelajaran Malaysia
January 1988 ˇV December 1990 Lower Secondary School, SMKA Tengku Ampuan Hajjah Afzan (SMKATAHAP), Jerantut Pahang. Sijil Rendah Pelajaran
College and School Co- Curricular Activities
June 1997 ˇV December 1998 Member of HUMAN POWERED VEHICLE DESIGN TEAM, Mechanical Engineering Department Colorado State University. Fort Collins CO. Developed Sensors utilizing load cells to measure Drag Coefficient of vehicle models in wind tunnel simulation.
Certification
Professional Course Attended
April 2007 Elliott Wave Theory ˇ§How To trade Like A Proˇ¨. Organizer:- Elliott Wave Master Trader En. Ismail Ibrahim.
June 2006 Goal Dynamics Seminar. Organizer:- Creative Network International (Enterprise) Sdn Bhd.
October 2005 Agency Manager Seminar. Organizer:- Creative Network International (Enterprise) Sdn Bhd.
October 2002 Design, Operation, Maintenance, Inspection of Rotary Equipment. Organizer :- Petronas Technology Institute, (INSTEP), Bandar Baru Bangi Selangor.
April 2002 Pump Application Workshop. Organizer:- Added advantage Asia Pte. Ltd
Additional Information
References:
1. Ir. Tharmaseelan Thanabalasing, Project Manager, n-Butane Plant Modification Project (2002-2004) MTBE (M) Sdn Bhd,
lot 111, kawasan Perindustrian Gebeng, 26080 Kuantan Pahang.
Tel: 609 585 6700
2. Human Resource Manager,
MTBE (M) Sdn Bhd
Lot 111, kawasan Perindustrian Gebeng, 26080 Kuantan Pahang.
Tel: 609 585 6700
Hot Categories
Chemicals
Batteries