Egypt Zones accountACCOUNT

Field Engineer ( Hydraulic &Pipeline & Pneumatic Fields)


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 1 years
Relocation: Yes - Internationally

Industry Experience
1 years Mechanical Engineer
1 years Technician
10 years Programmer

Career Objective

Really, I reed to be pofiessional in the Hydrauic & Pipeline & Pneumatic Fields

Professional Experience

Graduation Project :B. Sc. In Hydraulic systems
Graduation Project description :"The main aim of the project is to construct a hydraulic circuit consists of the most of popular hydraulic components, such as pump, relief valve, direction control valve, and hydraulic cylinders, which finally do a benefit work."
Also, The following Studies is Taken Place,
"1- Performance Test of the External Gear pump used in the circuit [Plot of Back pressure and Flow rate of the pump], "
"2- Performance test of the relief valve used in the circuit [ plot between the up-stream pressure and the flow rate through it] and determination the cracking pressure, full flow pressure and override pressure," "3- Performance test of the hydraulic output device (hydraulic cylinder) plots between, firstly, (inlet pressure and back pressure versus load on the cylinder when it is extending and retracting), secondly, (extending speed and retracting speed versus load on the cylinder) in the following arrangement of the hydraulic cylinders; "
I- Single cylinder
II- Two cylinder connected in parallel,
III- Two cylinder connected in series,
"4- Study the effect the hydraulic circuit oil temperature on the performance of the hydraulic circuit the above arrangements. "
Graduation Project Grade : Excellent, 94.67 %
===============================================================================
Job : Mechanical Maintenance Engineer
Company : TOSHIBA AL ARABY GROUP
Factory : Refrigerators Factory
Date of do my work : 7/9/2007 and continuing up till now
Job description :"The work nature is three shifts per day , Any shit my be I work according to requirement of the work, Dealing with the online problems of all factory machines taking the consideration of repair time and how find the methods to minimize it to reduce the effect of the stopping time of the machines during breakdown maintenance on the daily productivity of the factory, by the goog training programs for technicals, and good preventive maintenance programs according to ISO systems of recording.
Dealing with (Cannon URTHANE Injection machines injecting foam in the
refigerators cabients and door. Also, Giess and Kodamic Vacuum forming
Machines. Plastic Sheet Extension Machines, Presses,Yutaka machine for forming the meatalic sheets of the refigerators."

Eductation

University : Menoufia University
Faculty : Engineering Faculty of Shebeen Al-Kom
Department : Mechanical Power Engineering
Profession : "Fluid Group
[ Specialized in Hydraulics (Fluid Transportation and Fluid power fields) machinery and Pneumatics Machinery ]"
Level : Bachelor of Mechanical Engineering [ Flung Group ]
Grade point Average of degree : Good, 71.91 %
Graduation Project : B. Sc. In Hydraulic systems

Certification

---Language skills----
Home Language : Arabic excellent
Foreign languages : English good spoken and written
French poor according to high school studies only -----Computer skills-----
Time of Frist Dealing : The Year of 1994
Microsoft Programs : Program no.1 - "MS- Windows of the following versions (3.11&95&98&xp)Installions and programing." Level - Advanced
Program no.2 - Ms- office Tools
Level - Advanced
Programmable Languages :language 1 - QW- BASIC Level - Advanced
language 2 - FORTAN Level - Beginner
language 3 - MATLAB Level - Beginner
Other Programs Grapher, Surfer, Smart draw, Minitab, …………

Additional Information

Training Course 1 : Thermal Power Plant Components
Training Place : Electricity Power Plant Of Shoubra Al-Khima, Egypt
Training period : from 24/7/2005 to 3/9/2005
Training Course description : The training is in the following points:
"Feed pumps and filtration of it form dirt and chemical treatment for preparing
the water for boiler using. Also, tube boiler used in the plant and its furnace
description, boilers drums which separate the wet steam from water, super heaters
used in making the steam dry, turbines used description (4 turbines), Tube
condenser for condensation purpose according to the feed pump liquid phase of
water requirement. Also, Gas turbines for beak loads requirements "

Training Course 1 : Heavy Hydraulic Machines [ Forklift and wire lift Complete maintenance ]
Training Place : KomatsuBishi Workshop in Alex., Egypt
Training Period : From 1/6/2006 to 1/9/2006
Training Course description : The training is in the following points:
1- Complete Maintenance of Diesel Engines
2- Complete Maintenance of Gear Boxes of the fork and wire lifters
3- Complete maintenance of Hydraulic cylinders, valves, Gears, and soon
the training period I was a technical in that work shop earn my life

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering 500-Information Technology Bid and Proposal Software » News » Control Software » News » Design Software » News » e-business » News » Gas Software » News » GIS Software » News » Import Documentation System » News » Oil Software » News » Petroleum Software » News » Procurement Software » News » Property Management Software » News » Sales automation Software » News » Simulation Process » News » Software » News » Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.