electrical site engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
get higher experience in construction work
Professional Experience
Consolidated Contractors Company ( CCC )
Sub-Contractors from BECHTEL & TECHNIP JOINT VENTURE ( BTJV )
The owner is Saudi Arabia Aramco
Responsibilities : As a Site Engineer
•Installation all the grounding system (Laying the Underground Cable – Erection the grounding Bare and Plate – grounding Rods Installation -termination for Cables – installation for the earth Pits).
•Tested the individual reading for the grounding rod after that reading of the Grounding rods connected with the total grid.
•Erection for the Power System (Power Cable tray and power conduit).
•Erection for the Lighting system (Supports –– Lighting Conduit - Mounting the Lighting Fixtures).
•Installation of the lighting and power panels.
•Fabricated the supports of the power Junction Boxes and select the best location for it according to the status on the site.
•Termination for the power and Control Cables at the classified area (hazard area) by using Barrir type gland.
•Discuss with the main contractor th final requirment of the site.
•Inspection with the main Contractor for all the work which it done in all the area.
•Inspection with the main Contractor and the client for hand over all the activity which done in the area, And
•Solving all the problems of Electrical Punch List with consulting team.
As a technical Engineer :
•Review all the drawing to make take off for all the materials which valid on it.
•Make a Complete study for all the Drawings to purchase the fitting which required to make the installation for the activities and also if any supports we need To Fabricate.
•Make Coordination between the Underground Piping Drawing and the Grounding Layout Drawing to indicate If there are Obstructions between them or not.
•Study the Steel Structure Drawing to see that if the Steel Structure Supports will be serving our Cable Trays and to indicate the Places which we will make the installation of the additional Support for the Cable Trays.
•Follow up all the activities which belong to the cable pulling as (Steel Structure cable tray support and duct Bank Installation).
•Prepear the packeage for the Solo-Run and the pre-commissioning Test.
Location :
KHURSANIYAH GAS PLANT Project
Kingdom Of Saudi Arabia
From July 2006 To update
Eductation
University Degree B.Sc. in Electrical Power and Machines Engineering
University Alexandria University
Date Of Graduation June 2004
General Grade Good (70.4%)
Graduation Project Installation of Power System of Iron and Steel Company (Excellent )
Years of Study 5 Years
Hot Categories
Chemicals
Batteries