Quality Assurance/Quality Control Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 9 years
Relocation: Yes - Domestically
Career Objective
To acertain that all construction works in my coverage is in accordance with the ITP and speak quality
Professional Experience
Detailed Work Experience:
From 2006 ~ date: HYUNDAI HEAVY INDUSTRIES CO. LTD. BONNY ISLAND
Project: Bonny Terminal Integrated Project (BTIP) Onshore Facilities/ Offshore Pipeline
Position Held: QA/QC Inspector (Civil and architecture)
Responsibilities:
-Preparation of Inspection and Test Plan (ITP), Work Method Statement
-Work inspection and documentation of Architectural Works
-Documentation of refurbished buildings such as: SPDC firemen accommodation, SPDC Clinic, SPDC fire station, Marine work shop and store.
-Work inspection and documentation of Civil Works such as: 25 km Asphalt Road paving network, culverts,Last line of defense (LLOD) 1 AND 2, Telecom duct bank, Sewage manhole, Pipe Sleeper and Supports, Pipe rack, Storm water drainage (u-ditch), 12metre deep Booster Pump 1,2 and 3, lighting poles, concrete paving (light and heavy), equipment foundations such as: fire and utility water pre-treat foundations, liquid ring compressor shelter foundations, Gas Turbine Generator foundations (GTG), GT- 005, GT-006, GT-007
-Documentation of handed over dossiers such as: Tennis court, Recreational Squash building, Fence (citadel and welded wire mesh), Flare Stack, Restaurant and Club House, hard and soft landscaping, buildings, etc.
-Documentation of A1 sheet for concrete pilling of barge- unloading ramp, shore protection pilling, helipad landing, Passenger boat Jetty.
-Ensure that work is done in accordance with the approved Method statements, Inspection and Test Plan (ITP), Procedures and drawings
2004-2006: SHELTER PLUS CONSULT Abuja
Post Held: Site Supervisor
2003-2004: NIGERIAN-FRENCH INSURANCE COMPANY PLC. Challenge, Ibadan-Oyo State
Post Held: Sale Executive/Branch Under writer
Responsibilities:
2002-2003: EDO DEVELOPMENT AND PROPERTY AUTHORITY
Ekiosa/Sakponba Road, Benin-City-Edo State
Post Held: Town Planning Officer (TPO)
1998-1999: ONDO STATE MINISTRY OF WORKS, LAND AND HOUSING
Oyemekun Road, Akure-Ondo State
Post Held: Town Planning Assistant (TPA)
Project: Ore Master Plan
Client: Ondo State Government
Resposibities:
-involvement in plan charting
-documentation of all local planning offices¡¦ reports
-involvement in development control exercises
Eductation
Qualification With Institution Attended:
-2000 HND in Urban and Regional Planning, Upper credit
The College of Technology,
Esa-Oke, Osun State, Nigeria
-1997 ND in Urban and Regional Planning, Upper credit
The College of Technology,
Esa-Oke, Osun State, Nigeria
-1993 Senior School Certificate Examination (SSCE), O¡¦Level
Army Comprehensive High School
Akure, Ondo State, Nigeria
Additional Information
Project Handled/ Involved:
ľ Bonny Terminal Integrated Project (BTIP) Onshore Facilities/ Offshore Pipelines, Bonny Island
ľ Iguosa housing Estate, New Lagos road, Benin City
ľ Re-designing of Oba-Ile housing Estate, Akure( HND-Project)
ľ Re-planning of Osun State Transportation System(ND-Project)
Key Competence:
ľ Excellent Communication skills in oral and written English
ľ Good inter-personal skills in understanding the workings of other team members
ľ Acceptance of challenges and responsibilities, ready to evaluate and assess self while working with other team members.
ľ Good knowledge of Civil engineering construction
Hot Categories
Chemicals
Batteries