Project Planner & Scheduler
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 16 years
Relocation: Yes - Internationally
Career Objective
To work for EPC company in the field of Project Planning, Control & Management - for Oil, Gas & Infrastructure project.
Professional Experience
EMPLOYMENT HISTORY:
Abroad:
A. From Feb-07 to till date TRAGS WLL, Qatar
B. From Sept-04 to Feb-07 Mercury Qatar Ltd. Qatar
C. From April-02 to Sept-04 Mecon Constructors Ltd. Qatar.
D. From Feb-01 to March-02 Dodsal Pte. Ltd. Dubai, UAE.
India:
E. From June`96 to Feb-01 Dodsal Ltd. Mumbai, India.
F. From July`94 to June`96 Advent Engineering Pvt. Ltd.
G. From June`92 to July`94 Gear Master Engg. Corp.
DETAILED EXPERIENCE:
A. FEB-07 to TILL DATE TRAGS ENGINEERING & CONTRACTING WLL. - Qatar
Sr. Planning Engineer
Project Handled:
•EPIC of Offshore Platform work for BH & MM Oil fields (Off-shore) – Completed.
This project was to upgrade, modification & installation of new 3 platforms (EPC) in BH & MM field in Qatar. The EPC contractor was Sime Durby. My role is co-ordinate with our offshore field staff, take daily report, transfer the material required. It also includes planning, coordinating I was Project coordinator & overall planner for the project.
•EPIC of Ras Gas CCO&C works - This is a maintenance contract in Ras Gas running plant. Most our works are preventive maintenance related, modification/ upgradation to the existing units or shut down maintenance type for RG’s train 1, 2, 3 & 4. (on going)
•Instrument Up gradation at PS-2 & PS-3 – Yokogava project. (Off-shore) (on going)
•Shut down for PS-2 & PS-3 (Nov-8 & Feb-09)(on going)
Responsibilities:
•Defining baseline program & the resource requirement for the project such as manpower & materials.
•Monitoring & updating the projects through P3 /P3e.
•Preparing, establishing project schedules. Follow-up progress reporting
•Monitoring & chasing manpower & major material requirement.
•Preparing internal budget for the project & monitoring the cost through SAP for the activities.
•Prepare monthly cost report, cost forecast & annual budgets.
•Preparing & finalized variation claim for change orders and time extension claims.
•Certify subcontractor’s billing and monitor their progress. Assist them in preparing & achieving the schedules.
•Preparing weekly & monthly reports and other techno-commercial documents for the management & client.
•Leading the Planning & QS team. (2 onshore + 1 offshore)
•Maintaining the status of project deliverables such as drawings & material deliveries logs.
•Evaluate the performance contractors & various trade peoples.
Eductation
EDUCATION AND PROFESSIONAL QUALIFICATION
1. Master of Business Admin. (MBA – Technology) with 1st class from Chifley Business School Australia.
2. Bachelors of Mechanical Engineering with Higher 2nd class from University of Mumbai- India
3. Diploma in Mechanical Engineering with Higher 2nd class from University of Mumbai - India.
4. Member of Project Management Institute (PMI) USA.
5. Honorary Vice President for Project Management Institute (PMI-WIPC).
Certification
6. Certification in Primavera P3 Ver. 2
7. Proficient use of Primavera Ver. 3.1, P-5,P-6, Sure Track, MS Project -2003
8. Proficient use of Excel, Word, Power point, MS Access.
9. Familiarity with SAP, Artemis etc.
Additional Information
B. SEPT-2004 – FEB-07 MERCURY ENGINEERING - Qatar
Sr. Planning Engineer
Project Handled:
•EPC of Museum of Islamic Arts Package # 3 & 4 (US $ 80 millions) (M&E works)
•EPC of Science & Technology Park ( US $ 55 millions) (M&E works)
Responsibilities:
•Defining baseline program & the resource requirement for the project such as manpower & materials.
•Preparing earned value report, weekly & monthly reports and other techno-commercial documents for the management & client.
•Managing a team of 4 specialist engineers from QS & planning.
•Delivering multi-disciplinary engineering works from concept through to preliminary design.
•Maintaining the status of project deliverables such as drawings & material deliveries logs.
•Program and budgetary control.
•Justifying the extension of time & related cost for the project.
•Participating in cost control method implementation.
•Preparing, negotiating & finalizing monthly bill & cash in flow.
•Liaising with the client for variation preparation, discussion & execution.
•Supporting the management in the areas of operation & execution.
C. April 2002 – August 2004 Middle East Constructors W.L.L. – Doha, Qatar
Sr. Planning Engineer / Contracts Administrator
Project handled:
• Construction of 4th & 5th LNG Tanks at Ras Gas
• Mechanical installation of NGL-4 Dukhan Project (including 3 months major shut down)
• NGL – 1 & 3 Shut Down project – 3 months normal maintenance & 5 months s/d
Hot Categories
Chemicals
Batteries