Reservoir Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
1. Calculate reservoir reserves
2. Design the artificial lift method
3. Solve the well problem
4. Make Work Program and Budgeting
Professional Experience
Along my final assignment at BOB PT. BSP - PERTAMINA HULU beside the knowledge of Production Technique (Calculate IPR, Head of pump, BHP, Stages etc), I re-design ESP to optimize the production and increase the oil flow rate (Qo) and also calculate the economical by using ESP as artificial lift include the prices of every each unit in ESP (Stages, motor, protector, junction box, electric cable etc) and making the sensitivity of oil price. So that my design will still economic until the lowest oil price. My ESP design based on condition of the reservoir (Static Fluid Level, Working Fluid Level, Bubble Point Pressure, Reservoir Pressure, Pump Setting Depth etc). I make a program to calculate the IPR by using Excel. After my design complete, I presenting to the Manager as an advice to Production Department. While presenting my design, the Manager asked me about my design and the reason why I choose the type of pump (Example IND450, IND 1300). Of course to have those design and calculation I have to make a well construction and design the well completion.
As we know that every step in Petroleum Industry is related one to each other so I have to analyze core sampling, analyze well testing data, and make simulation of each well. On several of my design is using comingle completion (with dual string). At the end it is show that I have an ability to make interpretation the reservoir data.
My final assignment in production shows that I have capability in Production Technique.
At the present I work as a Reservoir Engineer in PT. GANESHA PETRO - ITB, to develop IBUL field located on SSE (South Sumatra Extension), my primary duties is calculate the reserves, remaining reserves, ultimate recovery, and recovery factor. After that I do interpretation of logging map (Deflection of SP, GR, Deep Induction, Caliper etc), estimate the OWC (Oil Water Contact) and other aspect to predicting other production zone to read from Logging Map if there is another possibility to produce other zone at the same time (by using comingle with dual tubing) so that the oil production will be maximize, and then I join Production Department to design the suitable lifting method based on condition of the well. I also work with production department to prevent and solve the well problem (IBUL significant well problem is scale).
Eductation
Formal Education
Graduated Trisakti University Petroleum Engineering
GPA = 3.05 on scale 4
SMUN 70, Jakarta Senior High School Program
SMP 153, Jakarta Junior High School Program
SDN Kreo 01, Tangerang Elementary School Program
TK. Cahaya Ria, Tangerang Kindergarten
Informal Education
IPM – Prosper 9.0 (Petroleum Expert) Software
TOEFL Score 463 at Trisakti English Centre Certified
Graduated from LIA Mercu Buana University English Course (Advanced Level) Certified
Certification
1. Petroleum Innovation Technology For Future Oil and Gas Industries Development, March 15, 2003
2. Pengembangan Lapangan Gas di Lepas Pantai, April 11, 2003
3. Latest Innovation Of Work over and Drilling Technology, February 21, 2004
4. Petroleum Drilling Technology, June 5, 2004
5. Drilling Technology, October 2004
6. Field Project at PT. PERTAMINA (Persero) Daerah Operasi Hulu Jawa Bagian Timur. August 1-12, 2005
7. What Next Besides GPA, November 30, 2005
8. Reservoir Optimation-Coiled Tubing Technology, December 21, 2005
9. A Chance in Applying an Advance Technology for Increasing The Production of Oil, Gas and Energy in Indonesia, April 1, 2006
Additional Information
PROFESSIONAL AND AFFILIATION
Society of Petroleum Engineers, (SPE).
Ikatan Ahli Teknik Perminyakan Indonesia, (IATMI).
ORGANIZATION EXPERIENCE
Member of Organisasi Siswa Intra Sekolah (OSIS).
Member of SPE Student Chapter, Trisakti.
Member of Ikatan Ahli Teknik Perminyakan Indonesia (IATMI).
Member of Ikatan Alumni Trisakti (IKA-TRISAKTI)
Committee of Petrofair and Petrofest 2007.
PERSONAL INTERESTS
I am really interest in sports by join Taekwondo and music, by listening, playing guitar and drums, also often participate in music event. I also like to do some adventure, to refresh my mind.
Hot Categories
Chemicals
Batteries