Offshore field engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 12 years
Relocation: Yes - Internationally
Career Objective
offshore construction engineer
Professional Experience
- Mobilize barge with the necessary equipment, consumables and project material prior to its departure to the field.
- Work planning and supervision of barge operations on 24-hrs basis to achieve milestones in accordance with installation procedures, engineering drawings and client specifications.
- To achieve project objective consistent with corporate performance objectives including HSE.
- Fully responsible for engineering work and control of project material onboard barges.
- Prepare site queries, modification proposals, as-built drawings, installation procedures, risk assessment amendments, work-lists and job cards as required, in addition to attending daily progress meetings.
- Coordination between project team and operations as well as liaison with client representatives on all technical issues at offshore
Eductation
B.E. Degree in Mechanical Engineering
National Engineering College, M.S. University, Tamil Nadu
(1995), I Class 71.8%
Certification
English, Tamil, Hindi & Malayalam.
CAESAR II (ver. 4.2), PDMS 11.5, AutoCAD2000, CADWorx, Microsoft Office (Excel, Word, Access), Primavera, MS Project
B.E. Degree in Mechanical Engineering
National Engineering College, M.S. University, Tamil Nadu
(1995), I Class 71.8%
- NPCC Safety Induction Courses
- H2S BA Set Donning
- Sea Survival
- Personnel Survival Technique (PST)
- Fire Prevention & Fire Fighting
- Occidental Permit to Work (PTW) Training Level II
Additional Information
1 Hook-Up (HU) 1 Pile Installation (PI)
1 Pipe laying (P/L) 1 Jacket Installation by Launching (JIL)
1 Trenching (TR) 1 Flexible Pipe laying (F/PL)
1 Riser & Tie-In Installation (RTI) 1 Surface Tie-In (STI)
1 Cable Laying (CL) 1 Stabilization Mattresses (SM)
1 Shore Pull (SP) 1 Umbilical Pulling (UP)
1 Jacket Installation (JI) 1 Free span Correction/Grout Bag (FSC)
1 Deck Installation (DI) 1 Dry Docking (DD)
1 Sleepers Installation (SI) 1 Single Point Mooring (SPM)