Drilling & Completion Fluid Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 4 years
Relocation: Yes - Domestically
Career Objective
Capable to manage all issues related to the planning of fluids systems for well operations accounting for down hole/environmental requirements.
Professional Experience
12/05 Up to date ENI IEOC Egypt
Fluid Engineer working as mud and completion fluids supervisor.
Follow Port Fouad Temsah Baltim fields for PETROBEL in Mediterranean Off-Shore activity.
During this period achieved a good experience in different type of drilling & completion fluids and drilling activities:
Drilled Extended Reach well - HP/HT well - Extreme Lean Profile wells - Near balance and underbalance well (mud cap)- Mud line suspension
Apply Stress Cage (Hole Straghtning) to increase fracture gradient in sand layers
Use E-CD system to drill HP/HT well (ENI continuos circulating system)
Use Secure Drilling System to drill HP/HT well
OBM High Density - WBM HP/HT (Temp. 320degF) - New Tech. Inhibitive WBM (Hydrogurad Ultradrill) application - OBM No Damaging fluid Coredrill - High & Low Density No Damaging fluid (Brinedrill DiPro - FloPro) studing Particle Size Distribution of weighting agents - High & Low Density Completion fluids (KCl CaCl2 CaBr2 Zn/CaBr2)- High density slurries (Densecrete Micromax)
Application of new technologies for lost circulation (FLC2000 FORM-A SQUEEZE)
Optimization of drilling parameters and fluid properties for hole cleaning in high deviated wells
Worked in Cairo Office co-ordinating mud & cement service companies, supervisioning rig operations and waste management. Planning and designing fluids for well programme and operational problem.
05/05 12/05 ENI AGIP
Junior Mud Engineer assigned at ENI-Agip Ravenna Operational District, working as mud and completion engineer for on shore operation (Agri Valley & Pς Valley) and off shore operation on jack up rigs in Adriatic Sea.
Drilled Horizontal well in Agri Valley with Extreme Lean Profile
Multilateral completion number 5 with Dual Bore Deflector on well Agri 1or B.
Fluid waste management
Mini Beta completion system on wells Annabella platform in Adriatic Sea.
Performed Frac Pack and Gravel Pack.
06/04 05/05 Joined ENI E&P attending Companys training course including period of Training On The Job.
10/02 06/04 Lab Teacher in public high school Organic & Inorganic chemistry, Physical chemistry and Biological chemistry labs.
Eductation
High School Diploma, June 2000 - Industrial Chemistry Expert marks 100/100.
Certification
ENI Drilling and Completion Fluids Engineer Course at Eni Corporate University training center Cortemaggiore (Italy), June 2004 May 2005.
Effective IWCF, Surface BOP Stack, Eni Corporate University training center Cortemaggiore (Italy), May 2008 - Expiring on May 2010.
Survival and H2S Training course, APT Pavia (Italy), July 2004.
Hot Categories
Chemicals
Batteries