Egypt Zones accountACCOUNT

Process Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 7 years
Relocation: Yes - Domestically

Industry Experience
7 years Process Engineer

Career Objective

Please accept this letter and accompanying resume as application for a position of Process Engineer; in advance I appreciate your consideration of my qualifications.

Professional Experience

Provide consultative support to ensure the gas processing plant, storage& terminal facilities, and the Reheat Desalination Units (RH Units) are safely and efficiently operated.

Manages and provides on site technical support (process simulation [PROII & HYSIS],plant trouble shooting, carrying out preliminary feasibility studies, cost & benefits estimations, …etc).

Monitors and controls day-to-day the operating parameters of natural gas processing plant & TheReheat DesalinationUnits (RH Units),(pressures, temperatures, feed flow rates of the gas ), and the production of Sales gas, LPG, Naphtha & Potable Water from RH Units ( its amounts and its specifications ).
Familiar to deal with all references, manuals, PFDs & PIDs,All materials used in our gas plant (chemicals, filters, solid discants ),also make a daily, monthly & annual reports include all the former points.

Familiar to DSC operating control devices, plant control philosophy,and its software configurations particullary the 800 XA system& OperateIT.

Can deal with all storage & loading terminal facilities (spherical & cylinderical tanks[floating & fixed roof]) (Tankers Shipping through Berths(loading and off-loading practies), Trucks through Loading Arms & Pumping through Pipelines).

Undertakes the study of management of change (MOC), gives directives in order to successfully and safely integrate these changes.prior passing to the relevant Department for implementation.

Updates Operational Procedure Guides, incorporates any changes effected during the implementation of plant management of change (MOC) or new projects. Review technical standards, specifications and recommend amendments.

Advises on specification/sizing of process equipment such as:metering ( Orifice meters, transmitters and flow factors), fluids flowrate, vessels and columns, pipelines, hydrate prevention, glycol losses, etc.

Reviews and comments on pre-commissioning / commissioning and start-up procedures

Eductation

B.sc in Chemical Engineering&Petroleum Refining with grade average (GOOD) in the academic year 2001

Certification

a.Processing in Natural gas industeries at MOBIL training center (10 days)
b.NGL, LNG & Natural Gas Processing at MOBIL training center (10 days)
c.HAZOP & HAZAN at GUPCO training center for 5 days.
d.STOP for safety at GUPCO training center
e.First aid at GUPCO training center
f.Preventive & Defensive driving at GUPCO training center
g.Valves (operation,maintenece,sizing) at MOBIL training center 5 days.
h.Heat Exchanger Design & Maintanance at MOBIL training center 5 days.
i.Pressure Vessels Design and Inspection at MOBIL training center 5 days.
j.Pump operation &maint. at MOBIL training center for 5 days
k.Applied DCS &SCADA system at petrolium coplex egyppt for 5 days.
l.Gas production facilities at GUPCO training center
m.Safety Awarness at GUPCO training center

Additional Information

Participated The Gas Plant Team TO Increase The Plant Performance C4% Recovery By performing feild test for shooting the max. Optimum flow for turbo-expander macines to get the max. Avalable efficiency. This is to over come the problem of the efficiency curve changing due to the machine running since the gas plant start-up (1982),and gas composition change. (This test is recommended by (GPSA ).

Implemented HAZOP study for :
1. the fuel gas system for U-104 gas plant ,
2. iso-tank as anew installation for holding LPG oudrant ethyle mercaptane

Upgrading of DCS System From MOD-300 System To Industrial ITSystem By ABBCompany.

Debottelnecking of low efficiency of propane compressor in the summer seasone due to under sized condencer,by performing ahysis simulation to calculate the required condecer duty and apply the results by anew installation of water trim cooler after the air cooled H.Ex (condencer),wich resulte in increasing the avalability and rliability of the propane compressor,as aconsquance this iprove c4 % recovery in depropanizer twors, and handel the excees saqara gas through dehdration chiller.

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.