Industry Experience
17 years Control Engineer

Career Objective

1/92 – 2/94:Shift charge engineer - EEA Cairo south power station gas turbines (3 x 110 Mw) Responsible for operate of 3 General Electric MS9001 (110 Mw) industrial gas turbine.

Professional Experience

4/2000 – Till now:
Shift charge engineer and operation manager assistant - Employed by Siemens AG Company (O&M Staff) at MidElec Power plant, Al-Amerya Free Zone Area, Alexandria – Egypt, which includes a Siemens gas turbines (3 x 63 Mw) by Siemens + two diesel engines ( 2 x 5.5 Mw ).
The master control is TELEPERM XP by Siemens Company. This project feeds 3 Petroleum Refineries (MIDOR, AMEREYA & ALEXANDRIA).
- Examples from My modifications and assignments in this position:
•Coordinate and monitor the construction and commissioning activities during the project.
•Witness the plant Installation from the foundation till received the plant, Commissioning, Reliability test, Start up and performance test as combined cycle performance test responsible.
•Recommends changes and improvements in (P&I) Diagram.
•Correct some logics during the units commissioning.
•Correct many (hundreds) alarms and events types according to operation priority.
•Many modifications in the function diagrams to stabilize the units.
•Prepared GT trip and shutdown circuits with all settings in one diagram.
•Prepared the training manual with all actual settings as station manager instructions and share this knowledge with operation staff engineers.

Eductation

B.SC in Mechanical power engineering May 1988 - Faculty of engineering - Menofia University
.- Examples from My modifications and assignments in this position:
•Witness the three HRSG (which connected with gas turbines) Commissioning, Reliability test, Start up and performance test as gas turbines and HRSG performance test responsible.•Solve big problem in MARK IV system, if one microprocessor is down and has many voting mismatches, GE advised us to restart it again but mostly this process leads to unit trip, then I solved this problem without restart the computer by force all binary signals that have voting mismatch to match the others computers and also increasing the analog values to match the others, this process done successfully hundreds times with 100 %.
•Change some control constants to adjust the unit acceleration and loading behavior.•Prepared GT trip and shutdown circuits with all settings in one

Certification

•GTCC associates overseas Bechtel incorporation on job training of the combined power plant•Westinghouse distributed processing family WDPF standard operating course at Cairo south power station, Westinghouse electric•Westinghouse distributed processing family WDPF software maintenance course at Cairo south power station, Westinghouse electric•Giving training courses for Cairo South Power station engineers in control systems (MARK V, IV & WDPF) and performance tests for gas & steam turbines and boilers.•6 months training course (by Germany staff) in operation & SIEMENS power stations control (TELEPERM XP) at at MidElec Power plant, this includes gas turbines (3*63 MW).•TXP (Siemens power plant control) Simple cycle power plant simulator training course in GERMANY

Additional Information

WORK EXPERIENCE:Professional Engineer with more than 17 years experience in power generation technology with big global companies (GE and SIEMENS) specifically in the field of Commissioning and Operation with the following experiences:•Witness many energy projects Installation from the foundation till received the plant, Commissioning, Reliability test, Start up and performance test as combined cycle performance test responsible.•Ability to operate Gas turbine and Steam turbine plant efficiently within a varying range of load condition and understanding of operating parameter and practice•Practical knowledge of power plant electrical systems and electrical protection systems.•Practical knowledge of plant isolation from the systems.
•Familiarity with Distributed Control Systems (DCS), single line diagram and Piping and Instrument (P&I) Diagram.•Practical knowledge of Water Treatment Plant and Demineralization Plant.•To approve Cold Work, Hot Work, Confined Space Entry Permits, Vessel Entry Permits for jobs to be carried out in the plant & construction area.•Have good knowledge in software and hardware to be solving any problem especially in GE and SIEMENS control systems.
•Believe me, My papers (contains all control algorithms and troubleshooting) is the main training materials for my colleagues at Cairo south power station (MARK IV, V) and MidElec power plant (TELEPERM XP).

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.