Egypt Zones accountACCOUNT

civil structural engineer certified by OSHA


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 2
Experience: 3 years
Relocation: Yes - Internationally

Industry Experience
1 years Structural Engineer
2 years Structural Engineer

Career Objective

Seeking a job of CIVIL ENGINEERING, to be a part of a reputable company where I can utilize my skills to meet the company growth and profitability and at the same time secure a lasting and fulfilling career.

Professional Experience

ƒæFrom Oct. 2007 ¡V Present :

Employer: Al Ahmadiah-Aktor LLC - Dubai

-Working as TECHNICAL OFFICE Eng. For project such as:
Jebel Ali Sewage Treatment Plant (JASTP), Dubai- Value Dh. 1.6 billion

The scope of work under this contract is the construction of 300,000 cubic meters per day wastewater treatment facility. The plant is to be built on a 675 hectare desert site
Located south-east of the Jebel Ali Free Zone And consist of about 27 water structures, & pipelines.

-Owner: Dubai Municipality.
-Consultant: MWH.

- Duties and Responsibilities:

„XReviewing and checking detailed construction drawings for wide range of reinforced concrete structural elements for different structures.
„XStudying and checking the structural design drawings with issuing the required RFI¡¦s for the missing information, details, and discrepancies with MEP & architectural design drawings.
„XReview and checking the workshop drawings (Concrete Dimension & Reinforcement details and bar list) for deferent structural elements.
„XSupervise and follow up engineering subcontractor or in-house team in preparing detailed construction drawings with fully supporting in technical issues.
„XFully coordination between structural department and MEP utilities (pipes, ducts, sleeves and box-outs¡Ketc), architectural, and the other parties (Q.S, Q.C, planning ¡Ketc).
„XLiaise with the structural consultant and construction team in solving the site problems with preparing proper structural proposals and issue the field sketches ¡V FCR¡¦s - accordingly.
„XPreparing proposals and RFI's to facilitate construction.
„XVerifying and checking Claims, DCN¡¦s (Design Change Notification) - variation orders ¡V presented by the various subcontractors and checking incoming invoices subsequently.




ƒæFrom Jan 2007 ¡V Oct. 2007 :


Employer: AL ¡V Esteshareyoon Zuhair Fayez Partnership

-Worked as Structural Engineer.
-Worked in : - (by using international Codes)
* Saudi Monetary Agency (Sama)
* Residential Compound for Sheikh Sultan M.Saleh Al-Athel
* King Abd Alaziz City for science and technology (KACST)
* King Khaled University (KKU)
* Design and site adaptation of Al-Rajhi Bank

Eductation

„X1988-2000 Abd El- Aziz Bin Soud Schools
ľFrom KGS Till Secondary Stage In SAUDI ARABIA

„X2000-2005 Faculty of Engineering (Ain Shams University)
ľMajor in STRUCTURE
ľBachelor Degree. CIVIL Engineering

ľSenior project (Structure) :
1.Analysis and Design of Villa
2.Analysis and Design of Stadium
3.Analysis and Design of Roof Cover
Grade: B (Very Good)

Certification


ƒæOSHA¡¦S (occupational safety and health administration) Disaster site worker.
ƒæOSHA'S 7600 - Disaster site worker (16 ¡V Hours).
ľOSHA'S construction safety and health.
ƒæHAZWOOPER (40 ¡V Hours) training course.

Additional Information

ƒæFrom December 2005 ¡V December 2006 :

Employer: TALENT ENGINEERING COMPANY (TEC).

-Worked as Structural Design and Detailed Shop Drawings Engineer.
-Worked in :-
1- Burj Dubai development ¡V The Dubai Mall project ¡V valued US$ 800 million

The scope of work is Construction of Dubai Mall Project which is considered the biggest mall in the world & it¡¦s located at the most prestigious square kilometer on the planet, the area of project is about 330,000 m2, and consist of about 37 various buildings.

2- Burj Dubai development ¡V The Dubai Mall Hotel

The scope of work is Construction of Dubai Mall Hotel Project which is located at the most prestigious square kilometer on the planet, the project consist of a tower (45 floors) + Podium ( 3 floors ) .

3- Gulf Towers III (The Views)
4- Rabigh Power Station (KSA)

- Duties and Responsibilities:

„XReviewing and checking detailed construction drawings for wide range of reinforced concrete structural elements for different structures.
„XStudying and checking the structural design drawings with issuing the required RFI¡¦s for the missing information, details, and discrepancies with MEP & architectural design drawings.
„XPreparing the workshop drawings (Concrete Dimension & Reinforcement details and bar bending schedule ¡§B.B.S. ¡§ ) for deferent structural elements according to British Standard ¡§B.S. 4466 & B.S. 8666 ¡§.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.