piping qa/qc engineer with 6+ years of experience in construction projects in oil & gas,petrochemicals sector
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 6 years
Relocation: Yes - Internationally
Career Objective
a graduate mechanical engineer having self initiative and motivated, wish to contribute for the growth of an organization with leading corporate of hi-tech and challenging environment to an extend of my optimum potential.
Professional Experience
• Monitoring shop fabrication of piping spools & supports
• Fabrication, Erection & Inspection of piping using Inconel, Monel, CS, SS, GRER, RTR, PVC etc.
• Attended 4 plant shut downs and 8 unit shut downs.
• Shut down work includes inspection of Acid lines, Alkali lines, TiCl4, Fuel gas, Utility lines, Process gas etc
• Coordination of NDT activities
• Preparation of ITP for various construction activities
• In process inspection of all activities with subordinates
• Preparation of Piping Test Packages for AG / UG piping.
• Preparation of Piping Test Packages for Package Units like Boiler, Heater, Cold Box, Refrigeration Unit, Chlorination unit etc;
• Preparation of Piping Test Packages, Mechanical Clearance Inspection & Pressure Test Inspection with Client.
• Controlling of test packs from Site & QC department.
• Coordinating with Planning for work schedules and priorities.
• Coordinating with clients for the priority systems & handover the systems to start the Pre-commissioning activities according to schedule
• Coordinating with site for the completion of priority systems & handover the systems to the client for commissioning & precommissioning activities.
Eductation
Degree in Mechanical Engineering
Certification
ASNT Level II in RT, UT, PT & MPT.
Additional Information
Line of Experience:
PLANNIG
1. Planning of Activities.
2. Preparation of PERT charts.
3. Estimation of Jobs to be executed and also Appraisals of projects/Site
4. Cost Control for bought out items.
5. Handling of Manpower.
6. Preparation of progress reports and review of progress reports.
7. Preparation of Bills and chasing of Payments.
Line of Experience:
FIELD
1. Fabrication & Installation of pipelines
a) G.I. (Threaded line) pipes (up to 6”)
b) C.S. (Welded line) pipes (up to 36”)
2. Dismantling of Two Floating Roof Tanks of 58 meter Dia using Hydraulic jacking method
3. Fabrication & fixing of MS platform Gratings in the Units during Plant shutdown
4. Cleaning & Hydro testing of 14” Cross-country pipeline of 8 kms using Foam & Batch pigs
5. Working on pipelines during Plant shutdown
6. Fabrication & Manufacturing of Two Antennae Reflectors for RADAR System using 1” Dia Stainless Steel pipe of 1mm wall thickness
7. Fabrication of Aluminum Drums & Trays for overhauling of ship
Hot Categories
Chemicals
Batteries