AL HUGAYET TADING CONT EST.
POSITION : INSTRUMENT TECHNICIAN
PERIOD : 11 Th JULLY 2007 - TILL DATE
Projects Involved
SAUDI ARAMCO OIL COMPANY (QURAYA SEA WATER PLANT) KURASI PROJECT
POSITION : INSTRUMENT TECHNICIAN
PERIOD : 15th JULLY 2007 - TILL DATE
Work performance;
Calibration of instruments, loop checking and pree- Commissioning
Calibration of field bus instruments inspection.
Loop checking and functional checking inspection.
Vibration probe checking and pree- Commissioning
AARKAY INSTRUMENTS PVT. LTD.
POSITION : Offshore Instrumentation Control Technician
PERIOD : 8TH JULY 2003 – 9 TH Jully 2007
HYUNDAI HEAVY INDUSTRIES CO. LTD.
Projects Involved:
ONGC MSP / MUT Offshore Modification Project.
POSITION : Instrument Calibration & Commissioning Technician
PERIOD : 28th OCTOBER 2004 – 30th APRIL 2006
Work performance;
fisher level controller DLC 6000 installation and calibration.
Pressure transmitter , Level transmitter, temperature transmitter, Flow transmitter
Repairing and calibration.
Pree -commissioning of all instrument, commissioning of all instrument,
Loop checking and functional checking .
BG EXPLORATION AND PRODUCTION INDIA LTD.
Projects Involved:
PANNA Offshore Modification Project.
POSITION : Instrumentation Commissioning Technician
PERIOD : 15th MAY 2006 – 20th JUNE 2007
Work performance;
Pneumatic level controller and level transmitter calibration
Pneumatic pressure, level, flow transmitter calibration and installation
Pneumatic instrument loop checking, commissioning and pree- commissioning
Shut down panel testing and commissioning.
Offshore STD project (offshore new well pree- commissioning and commissioning)
Shut down panel checking and Commissioning and pneumatic instrument calibration and I installation.
INTELLIGENT AUTOMATION SYSTEMS PVT. LTD.
POSITION : Process Control Instrument Technician
PERIOD : 2ND JANUARY 2003 – 7TH JULY 2003
Tarapure Atomic Power plant (TAPP 3&4)
Work performance
Calibration of instruments, loop checking and Commissioning.
Eductation
diplom a of prosses instrumention
Additional Information
offsore exp 3 year
onsore exp 3 year
Hot Categories
Chemicals
Batteries