PROJECT PLANNER AND EXECUTION
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
WORKED IN MIDDLE MGT AS SR MANAGER AT RELIANCE IND LTD HAZIRA SURAT
NOW WORKING AS LEAD POLYOLEFINS ELECTRICAL RELIABILITY ENGINEER AT SABIC PROJECT
Professional Experience
Resigned from Reliance industries ltd, Hazira, SURAT in the month of November 2007.
About the present employer yansab SABIC at Kingdom of Saudi Arabia
Joined as Reliability Electrical Engineer in Technical Department.
Presently erection and commissioning activities in full swing for Petrochemical complex for
PP, LLDPE [ EPC : AKER AND SINOPEC]
HDPE [ EPC :STONE AND WEBSTER ]
EG [ EPC : TOYO ]
CRACKER [ EPC: TECHNIP ]
BBTX, BUTENE [ EPC : STONE AND WEBSTER ]
Job role
• Presently working as LEAD Engineer for PP, LLDPE, PHU & HDPE and coordinating for Walk downs & Inspections with FOSTER WHEELER , AKER SOLUTIONS & SINOPEC .
• Inspection of SQUARE D Master clad Switchgears for HV [13.8kv], MV [4.16 KV] and ABB transformers erection.
• Inspection of HRGU [High resistance Grounding unit], Motor pact MVMCC, MV Contractor.
• Inspection of Power Zone 4 Low voltage switchgear, Model 6 MCC, ATV 58 Variable speed drives.
• To verify GE Multiline 745 Transformer Management], 750 [Feeder Management & ATS operation] & 769[Feeder Management] Relay, Micro logic Trip setting in NW square D breakers settings.
• To attend the walk downs for electrical Integrity
• To review electrical activities with EPC contractor AKER and SINOPEC
• To review final documents with QC Inspector from Shell and Foster Wheeler
• Review the QVD and test documents.
• Cross review the approved protection setting. Minimum one relay selected randomly from each group of relays or switchgear.
• Review the switchboard installation inspection format developed by contractor.
• Witness the precommissioning test as per format.
• Verify FAT report and check the points taken care before clearing the SAT.
• Determine the suitable Enclosure for the area and verify the same with the Data sheet of the motor as well as it on the name plate.
• Ensure that the standard torque procedure is followed for terminations.
• Ensure preservation plans are followed to prevent Low insulation resistance in (LV) switchboards due to prolonged storage in a humid and/or dusty environment and/or unsealed cable entries in substation floors.
• Cross review of electrical systems with [SES] SABIC ENGINEERING STANDARDS.
Eductation
B.E. ELECTRICAL
Additional Information
PERMANENT ADDRESS:
PLOT NO 101, SHIVAJI NAGAR,
NAGPUR 440010
MAHARASHTRA [ INDIA ]
Contact no 09370925402 [ India ]
00966 564748923 [ KSA ]
email : veeshalkumar@sify.com
Hot Categories
Chemicals
Batteries