Egypt Zones accountACCOUNT

Rigger


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 2
Experience: 3 years
Relocation: Yes - Internationally

Industry Experience
3 years Construction Technician

Career Objective

Rigger

Professional Experience


GS Daewoo Laffan Refinery Project – Ras Laffan
State of Qatar, DOHA
September 9,2007- February 20, 2008

Rigger
• First you should wait the working permit and you must use the physical proper equipment before you start your work.
• You should coordinate first to your foreman and supervisor before start working.
• Before working you must check the status or the actual weight of the equipment facilities to be installed or lifted.
• Check the exact location and the destination of the load so that you will know where will you position the crane.
• Confirm the location of the crane safe working radius, lifting weight, set crane and check the level on the ground generally evaluate crane set up.
• Check and maintain clearance from any obstruction and confirm the stability of the crane, remove any object that might obstruct or touch when lifting operation start.
• Check the lug or the part of the equipment to be attached when lifting, and prepare the necessary lifting materials which are (sling belts or sling wires, shackles, taglines, and chain block) if necessary to be used. Be sure that they are tested and modified.
• The banksman is the designated rigger which is required to be used a rigging vest and he must maintained a good and clear communication with the operator and riggers and should used the proper and standard when giving signal to the operator abut the movement
• Don’t forget to put barricades on your working place where ever the crane reaches and don’t let the people go inside the lifting area except the riggers . Be sure to use safety harness when working at heights.
• After lifting operation done be sure that it is okay on its position after that take all the materials that has been used in lifting operation and prepare for the next lifting operation.


Benghazi North Combine Cycle Power Plant Project
Daewoo Engineering & Construction Co., Ltd.
Benghazi, Libya
December 9, 2006 – July 24, 2007

Rigger



Benghazi North Combine Cycle Power Plant Project
Daewoo Engineering & Construction Co., Ltd.
Benghazi, Libya
August 14, 2005 – August 15, 2006

Rigger


Eductation


EDUCATIONAL ATTAINMENT

COLLEGE : Zamboanga City State Polytechnic College
Zamboanga City, Philippines
COURSE : Electrical Technology
YEAR GRADUATED : 2000-2003

SECONDARY : Arena Blanco National High School
Zamboanga City, Philippines
YEAR GRADUATED : 1996-2000

ELEMENTARY : Talon Talon Elementary School
Zamboanga City, Philippines
YEAR GRADUATED : 1990-1996

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Contracting Services » News » Dredging » News » Electrical » News » Mechanical » News » Pipe Lines Installations » News » Steel Works » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.