Maintenance Planner
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
Good career as maintenance Planning engineer and work in and learn more technical systems and plans.
Professional Experience
Current job
Job title : Data Gathering and Planning Engineer
Employer : GULF OF SUEZ PETROLEUM COMPANY (GUPCO - BP)
Employer Country : Egypt
From : November 2006
Job description : 1. Data Gathering from P&ID's and from site Verifications and make master equipment list for all locations
2. Build asset hierarchy based on as built piping and instrumentation drawings (P&ID’s) and incorporating into MAXIMO and ensure static date quality.
3. Criticality classifications for locations and develop failure codes for equipments related BP standard
4. Ensure implementation of maintenance policies and routine by auditing and assessment on Maximo Program.
5. Develop preventive maintenance program and ensure implementation through computerized maintenance management system on MAXIMO program(CMMS)
6. Monitor preventive maintenance and inspection programs implementation.
7. Set up the stock requirement and review the spare parts interchangeable record (SPIR) for the new assets in conjunction with discipline.
8. General knowledge of maintenance disciplines. Mechanical / electrical / instruments equipment used in oil and gas industry plan/ schedule all maintenance activities (Preventive , corrective, predictive, inspection and re-design)
9. Review all work request raised and confirm availability of resources on MAXIMO.
10. Making different evaluations for maintenance work throw different KPI’s reports from MAXIMO system.
Previous employment
Job title : Mechanical Maintenance Chief
Employer : El-Araby Group of Companies & Factories (TOSHIBA EGYPT)
Employer Country : Egypt
From : May 2002
To : October 2006
Job description : 1- Develop preventive maintenance plans for TV factory
2-Excute work orders and supervising the work
3-Follow up Maintenance work and crew
4- Do all maintenance activities Preventive , corrective, inspection and re-design
5-Installation and follow up maintenance of production lines and production machines.
6-Study machines problems and offer the solutions to the managers.
Eductation
First University Degree : B.Sc. Engineering
University : Zagazig University – Banha branch
Faculty : Engineering - Shubra
Major : Mechanical Engineering – Major Power
Graduation project : Design of sewage pump station
Grade : Very Good
Graduation year : 2000
High School Degree : Thanawia Amma
High School Name : Beltan Thanawia
Grade : 91%
Certification
:1- COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEMS
in (The American University In Cairo)
Course Outline
• Introduction
• Planning of maintenance operations
• Manpower requirements planning
• Spare parts requirements planning
• Preparation of maintenance budgets
• Annual and monthly maintenance plans
• Planning plant shutdown
• Equipment reliability and failure
• Control of maintenance operations
• Performance evaluation of maintenance systems
• Maintenance management by computer
• Some real case studies
2- MAXIMO V5.2 (As CMMS system)
3- HVAC ventilation & air conditioning duct design
4- Absorption cycle (LiBr/H2O) water chillers for air conditioning
5- Helicopter Safety Induction. 6- HSE Training Course.
Additional Information
Availability : I am able to start work after 4 to 6 weeks from announcement
As : Full Time
Rank : Any
Job field : Maintenance/Repair, Mechanical Engineering
Job location : Egypt - Arab Countries
Hot Categories
Chemicals
Batteries