Curriculum Vitae
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
To develop a bright future and great achievement in knowledge, skills and satisfying accomplishment in the engineering career.
Professional Experience
Assist’s in preparing the Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), welder certificate, welder list, Inspection & Test Plant (ITP). Also monitor and conduct Welding Procedure Qualification Test (WPQT) and Welder Qualification Test (WQT)
Mainly responsible carry out day to day inspection and test requirement as per the inspection and test plant, code, standard and client spec. Managing the coordination for inspection and testing with Production section, Third Party, Authorize Inspector and the Client.
The scope is responsibility covered all aspect in inspection and testing for pressure vessel, piping and structural from material receiving, sending material to mechanical testing, to verify material, carrying out fit-up inspection, random inspection during welding, dimensional inspection before and after welding, inform to dimensional controller (surveyor) to check verticality, straightness, squareness and elevation before welding and after welding, final visual inspection, confirm the method of NDT ( UT, RT, DPT, MPI & TOFD ) requirement and liaise closely with NDT team to avoid any delays of schedule cause of NDT, to monitor and performing hardness test, liaise with PWHT team and ensure all comply with the approved procedure (if required), prepare the hydro test package prior hydro test, carrying out line check and raise punch list before hydro test, witness flushing before and after hydro test, witness pressure testing such as hydrostatic test, static test and leak test, air blowing after hydro test, carrying out line check again after reinstatement, close all punch list and also to complete all Inspection Test Reports. Also monitor the quality and safety of work undertaken by sub-contractor and production department involving major and minor fabrication.
The responsibility also covers the preparation of the Manufacture Data Book from the beginning till completely of the project.
Eductation
1980-1985 Air Tawar Satu Primary School
1986-1988 Air Tawar Secondary School
1989-1990 Kota Tinggi Vocational Secondary School
Additional Information
WORKING EXPERIENCE
Company Module Tech Sdn Bhd
Position Structure/Piping Inspector
Period February 2008 till Present
Project GO-RA Topsides
Client MURPHY Sarawak Gas
Company Syarikat Steelcon Sdn Bhd
Position Piping Inspector
Period December 2007 till February 2008
Project Petronas Mega Methanol Labuan
Contractor Lurgi
Client Patrons
Company Kencana HL
Position Structure / Piping Inspector
Period July 2007 to Nov 2007
Project MAARI Development Wellhead Platform
Client Clough Oil And Gas Company And OMV (New Zealand )
Company Kito Enterprises (LLC)
Position Pipeline QC Inspector
Period April 2007 to June 2007
Project South Pars Gas Field-Pases 9 & 10
( Two Underwater Pipeline System
Client Iranian Offshore Engineering Company (IOEC)
Hot Categories
Chemicals
Batteries