project field:- piping,cooling tower,water treatement plant,acid regeneration plant,boiler,erection and commissioning.
maintenance field:-air&gas compressors,pumps,boilers,valvesand turbine and know engineering standards.
Professional Experience
Diploma in Mechanical Engineering (1993)
ľ Ms Office
ľ Working as a SHIFT ENGINEER in AL GHURAIR IRON AND STEEL, ABUDHABI from September 11, 2007 to till date
Job Profile:-
„« Plant Structure erection nearly 1500 Ton
„« Acid regeneration plant structure work, erection (FRP Pipe line) and commissioning.
„« Cooling tower erection and commissioning (Capacity 1700 mtr3/hrs).
„« Water Treatment plant erection and commissioning (Capacity 50 mtr3/hrs).
„« Pipeline erection and hydro test (Pipeline flow drawing , isometric drawing and Piping standards).
„« Compressors,pumps,boilers erection and commissioning.
ľ Worked as Sr.Supervisor in THIRUMALAI CHEMICA LS LTD, India from February , 2003 to April 7, 2007.
Job Profile:-
„« UTILITY AND PLANT MAINTENANCE
„« COMPRESSOR HOUSE:
Trouble shooting and Maintenance of
(a) Double acting horizontal type opposed Non ¡VLubricated Air Compressor
(KHOSLA ¡V CREPELLE)
(b) Single acting Vertical type Non- Lubricated
Air compressor (INGERSOL-RAND)
(c) Screw compressor Lubricated (ATALAS COPSO)
„« PUMPS:
Trouble shooting and maintenance of all types of pumps
(Centrifugal pump, Reciprocating pump, Gear pump, )
„« VALVES:-
Flow control valves, Directional control valves and Pressure control valves
„« COOLING TOWER:
Maintenance of cooling towers, capacity ¡V 1700cum/hr
„« BOILER: Thermax-firetube (capacity-25 ton)
„« TURBINES:steam&gas turbines