1. Position: Electrical Engineer
Employer: Fluor Daniel (Throˇ¦ Al Ghanim Sepam) ˇV PMC & EPC PROJECT
Project Site: PETROCHEMICAL PROJECT, OLEFINS-2 (EQUATE) --- Kuwait
Period: Augˇ¦2006 to Till Date
Role & Responsibilities:
„« At present involving in Erection and commissioning of 33KV SF6 Switchgear, 11KV, 6.6KV & L.V. Switchgears, 33KV/6.6KV/415V transformers, Motors and all Electrical Equipments
2. Position: Site Engineer
Employer: ABB Engineering Technologies Co.
Project Site: Ministry of Energy (MEW)
Period: Febˇ¦2006 to Julyˇ¦2006
Role & Responsibilities:
„« Involved in Erection and Commissioning of 11KV ,6.6KV Switchgear and LT Switchgear
„« Involved in Preventive Maintenance of 132KV Substations and Troubleshooting of the following Equipments:
3. Position: Electrical Coordinator
Employer: Kharafi National, Kuwait
Project Site: Ministry of Energy (MEW)
Period: Novˇ¦ 1998 to Janˇ¦2006
Role & Responsibilities:
„« Coordinating with Ministry of Energy (MEW) -Electrical Dept. for day-to-day activities.
4. Position: Assistant Manager
Employer: Andhra Pradesh Rayons Limited (Thapar Group), India -
Largest Manufacturer of Rayon Grade Pulp
Period: Decˇ¦1996 to Novˇ¦ 1998
Role & Responsibilities:
„« Successfully commissioning of 15050KVA Power Plant Supplied by M/s Toyo Denki ˇV Japan before Targeted time.
5. Position : Senior Engineer - Electrical
Employer : The Andhra Petrochemicals Ltd.
Period : Novˇ¦ 1990 to Decˇ¦ 1996
Role & Responsibilities:
„« Involved in over all Site Construction Works Including Erection, Commissioning and Testing of Various Electrical Systems.
6. Position: Assistant Engineer
Employer: Madras Cements Limited (RAMCO Group of Industries ˇV Dry Process Plant ˇV 3500 TPD.)
Period: Marˇ¦ 1987 to Novˇ¦ 1990
Role & Responsibilities:
„« Execution of most Modern Dry Process Cement Plant with a Capacity of 1Million Tons Per Annum.
Eductation
Bachelor of Engineering Degree, Electrical & Electronics Engineering,
Nagarjuna University, India, 1987.
Additional Information
TRAINING ATTENDED:
• 12.044MW TURBO GENERATOR - TOYODENKI, JAPAN
• ABB DC DRIVES -- BANGALORE
• SIEMENS SIMATIC S5 (PC10) ˇV MUMBAI
• ALLEN BRADLEY VARIABLE FREQUENCY DRIVES ˇV DELHI
• TOTAL QUALITY MANAGEMENT ˇV ANNAR CONSULTANTS ˇV USA
• INTERNAL QUALITY AUDITOR ˇV ENGINEERING STAFF COLLEGE OF INDIA.
Hot Categories
Chemicals
Batteries