Petroleum Engineer (specialized in Natural Gas) seeking job in Oil & Gas sector.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 1 years
Relocation: Yes - Internationally
Career Objective
To work for an organization, which gives opportunity to utilize my attitude and aptitude in achieving common goal of organization and a bright career.
Professional Experience
• Pata Petrochemical Complex, GAIL India Ltd., Pata, distt. Auriya-U.P. (1st June, 2007 to 13th July, 2007)
Currently workin as an Engineer in SITI Energy Ltd, Moradabad (U.P.), India from 2nd June'2008.
Internships:
•Oil Fields, Oil & Natural Gas Corporation Ltd., Lakwa, Assam (10th July, 2006 to 27th July, 2006)
•LPG Recovery Plant, GAIL India Ltd., Lakwa, Assam (19th June, 2006 to 7th July, 2006)
•One week visit of Central processing facilities ONGC, Gandhar; Indian Petrochemicals limited, Vadodara; Petronet LNG terminal, Dahej; Gujarat Refinery, Vadodara.
•Three days visit to Indian Oil Corporation Limited Panipat refinery.
Eductation
Bachelor of Technology (Gas Engineering) with CGPA 2.76/4 from University of Petroleum & Energy Studies, DehraDun, Uttarakhand in the session 2004-2008.
Intermediate(+2) with 59.40% from Central Board of Secondary Education (CBSE), New Delhi in the year 2003.
SSLC(10th ) with 49% from Central Board of Secondary Education (CBSE), New Delhi in the year 2001.
Additional Information
Academic Achievements
•Gel Polymers-Paper presented at ISM-Dhanbad (Technical paper meet).
•Presented paper on “Fuels of the Future” in Seminar organized by University of Petroleum & Energy Studies, Dehradun.
•Five day personality development workshop by Dr. Rajesh Agarwal.
•Recruited as Field Engineer by SITI Energy Ltd. from 2nd June’08.
Projects Undertaken
•City Gas Distribution Network Design for Dehradun City (Major Project).
•Project on Optimization of energy consumption in Gas Sweetening Unit at GAIL India Ltd. from 1st June’07 to 13th July’07.
•A brief installation overview of Group Gathering Station at Oil & Natural Gas Corporation Ltd. from 10th July’06 to 27th July’06.
•Plant processes for LPG Recovery Plant at GAIL India Ltd. from 19th June’06 to 7th July’06.
•Sub-Surface Petrophysical Analysis using Micro Resistivity Log (Minor Project).
Extra Curricular Activities
•First prize winner in Car Rally organized by IOCL.
•Participated in on the spot Poster Presentation at ISM-Dhanbad.
Hot Categories
Chemicals
Batteries