Project Planner
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 15 years
Relocation: Yes - Domestically
Career Objective
•To work with dynamic organization which, promotes an environment conducive for professional persons.
Professional Experience
From November-2006 to date at Petroleum Development Oman (PDO) Project.
Working as a Planning / Scheduling Engineer with TEKFEN Construction & Installation Co. Inc.in Oman at Harweel Cluster Phase 2-AB Facilities Export pipeline Oil/Gas, Trunk & Flow pipelines (dia 6” to 18”) 163.00 K.m
January 2005 To Oct, 2006.
Worked with Tamimi Co. Construction Division Main Headquarters in Dhahran and is responsible in the preparation of Technical Proposals and Pre-qualification documents as required by prospective Clients/Projects These documents includes preparation of Overall Construction Schedule, Manpower Histograms, Equipment Schedule, Progress and Procurement S-curves, Project matrix of responsibilities, technical narratives of scope comprehension and all other requirements as required by the Client.
From April - 2002 to December - 2004 at Saudi Aramco Projects in K.S.A
Worked as a Planning / Scheduling Engineer with TAMIMI Co. Construction Division in Kingdom of Saudi Arabia at Saudi Aramco Berri Gas Plant Jubail for Underground Drainage & Services Piping work Ethane Recovery Project L 3812 and # BI-3172 Upgrade Fire Water System RTR piping work.
From May, 2000 to Dec 31, 2001
Worked as a Planning Engineer with Descon Engineering Ltd. In Proposal Department H.O (Lahore) Pakistan.
From Jan, 1998 to Apr, 2000.
Worked as a Planning / Cost Engineer with Descon Engineering Ltd. at Fertilizer Plant with client Fuji Jordan Fertilizer Complex Bin Qasim Karachi (Pakistan)
From Nov, 1995 to Dec, 1997.
Worked as a Planning Supervisor with Descon Engineering Ltd. at 4x323 MW Power Station Hubco Power Project with client IHI Japan (Baluchistan) Pakistan)
From July, 1991 to Oct, 1995.
Worked as a Asst. Planning Supervisor with Descon Engineering Ltd. at 2x110 MW Hydro Electric Power Station Extension Project Unit # 9&10 Mangla Dam (Punjab) Pakistan with client Skoda Expot.
From Dec, 1990 to Jun, 1991.
Worked as a “CHARGE HAND” Mechanical at Extension Project I.C.I Soda Ash Plant Khewra (Punjab) Pakistan with client I.C.I.
________________
Waheed-uz Zaman
Eductation
Associate Engineering in Mechanical with First Division in 1989 From Board of Technical Education Lahore (Punjab) Pakistan.
Matric with Science in First Division 1984.
Additional Information
OCCUPATIONAL QUALIFICATION
A) Descon Engineering Limited
Lahore (Punjab) Pakistan
Basic Planning & Scheduling Course (Primavera Project Planner) June, 2000.
Microsoft Office (Inducing Excel, Word)
B) Safety awareness course Petroleum Development of Oman (PDO)
C) H2S awareness course Petroleum Development of Oman (PDO)