Ammar Chabani
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
I finished my studies in 2002 I started working in well test with Halliburton .
Actually I work with EXPRO GROUP. As well test senior operator.
I am writing to express my strong interest in employment as field Engineer in your company.
Professional Experience
My qualifications and experience are as follows:
• Work on 1440 Tri-phase Separator
• Gauge DWT calibration.
• Maintain engine, compressor ….
• Pilot calibration.
• Work on Choke manifold (5 Kpsi, 10kpsi) and Surface safety valve (5 Kpsi,10 Kpsi)
• Work on Flow head with Coflexip (5 Kpsi ,10 Kpsi) (for DST purpose)
• Take flow readings,
• Computer and record well test data
• Measure flow rates of oil, gas and water
• Perform pressure tests on all surface test equipment
• Maintain and redress all surface test equipment
• Prepare and input the field ticket
• Computed and recorded well test data
• Measured flow rates of oil, gas and water
• Took surface samples of gas and oil
• Performed Emergency Shut downs
• Equipment Calibration, Lab & field lab analysis Equipment
Eductation
• Institute degree: Mechanical Engineering, Option: Energetic.
• Subject if: Amelioration d’un model of conductivity thermique d’un Lit Granular with
FORTRAN 77.
• Mention: Very Good.
Certification
PROFESSIONAL TRAINING:
2005 English training (Level 6).
2006 Surface well testing with Power Well services in Malaysia.
2006 Separator instrumentation with Power Well services in Malaysia
2007 Surface well testing with Expro Group services in Egypt
Additional Information
Field experience:
Leader crew in all surface well testing operations: inline test and DST. Using
The 3 phase horizontal and vertical separator 1440 Psi in Hassi Messaoud.
Good experience in the high pressure oil and gas field GTFT and BHP Oil field.
Operator of the sand filters, and catch filter.
Leader crew in clean up after frac. AGIP, GTFT
Well commissioning in BHP and responsible to start well of water, gas and oil.
Hot Categories
Chemicals
Batteries