Control and Operated( CCR )and PM work of operation
Professional Experience
„Function test of LSHH, LSLL to all process vessels
„Transfer Demulsifier, water clarifier, corrosion inhibitor from tote to day tanks
„Skimming oil in produced water flash vessel.
„Lower liquid level of fuel gas scrubber
„Skimming hydrocarbon in HC separator
„Top up TEG to surge tank
„Change filter elements of sock, charcoal, inlet filter
„Pressurize and depressurize Sales gas meter stream.
„Inspection of orifice plate (remove & reinstall)
„Isolation of gas compressor and engine for maintenance.
„Lower liquid level in HPU swivel recovery tank.
„Fluoronox heavy oil injection to turret lower seals.
„Skimming oil in produced water flash vessel.
„Clean pump suction strainer.
„Inspection of turret inner column.
„Check N2 in the HPU accumulators and accumulator in each swivels.
„HP pipeline,IP pipeline from,LP pipeline.
„Line up, Fill up crude oil, venting and offloading.
„Reset MCC loss of pressurization.
„Back flushing of cross heat exchanger
„Control and Operated( CCR )
'Start up gas commpressor
-2005-2007 A business is person (Repair a car, Modify machine)
-2001-2005 GIPP Co., Ltd,Position Shift Leader
„Control& Operation GT 26 operating 356.5 MW.
„Consumption report
„Update All Procedure
„Contact EGAT Daily declare, Resumption Short Notice, Weekly declare,
„Gas Billing, Import Billing
„Logic basic for operating
„Document Control system
„Created and scheduling operation PM work
„Verify missing equipment for PM
„Log out/Tag out project
„Control program start up&shut down and procedure GT, ST, WSC, HRSG, BOP
-1998-2001 Bangkok Cogeneration Co., Ltd. (Maptaphut Rayong)
Position Board man
„Responsibility Board man who responsible for shift leading in 112 MW. Combined cycle
„Cogeneration plant. Including Gas turbine-Generator, Steam Turbine
„Generator, Heat recovery steam generator unit, Water treatment plant
„Cooling water system, Chiller and Fire water system
-1997-1998 ESCO Engineering &Service Co., Ltd.
„Maintenance All Instrument Rayong 2 and service Maintenance System Instrument COCO
-1994-1996 Thai Petrochemical Industry Public Co., Ltd. (Now change name is IRPC)
„Maintenance Instrument System Boiler Repair Control valve
„Recalibrate all transmitter and Modify cooler analyzer
„Set workshop before commissioning
Eductation
2005 -2007 Bachelor of Science Vocation in Electrical
1990-1992 Rayong Technical College Diploma in Instrument
1987-1990 Rayong Technical College Vocation in Electrical
Certification
Hot Categories
Chemicals
Batteries